1 month ago | Report Abuse

Folks, the successful bidders to be announced in November 2024 by the Ministry of Energy Transition and Water Transformation through the Energy Commission. https://theedgemalaysia.com/node/729472

Stock

1 month ago | Report Abuse

Folks, Ministry of Energy Transition and Water Transformation through the Energy Commission stated that the LSS5 tenders provides opportunities for Bumiputera companies to get involved in the energy sector and compete healthily.

Stock

1 month ago | Report Abuse

Ministry of Energy Transition and Water Transformation for LSS-Energy Transition SuRiA - LSS5 5 tenders targets a total capacity of 2,000MWac:

a). The first package includes 250 MW of rooftop or ground-mount solar plants, with permitted generation capacities of 1 MW to 10 MW. It is open to companies with at least 51% Bumiputera ownership that are registered as a small- and medium-size enterprises (SME) with SME Corp Malaysia.

b). The second package includes 250 MW of rooftop or ground-mount solar, but with permitted generation capacities of 10 MW to 30 MW. It is open to companies that have at least 51% Bumiputera ownership, or from consortia with at least one Bumiputera company holding at least 51% equity.

c). The third package covers 1 GW of rooftop or ground-mount solar power plants, with permitted generation capacities of 30 MW to 500 MW.

d). The fourth package features 500 MW, and covers floating solar plants with permitted generation capacities of 10 MW to 500 MW.

Folk, the final two packages are open to companies that are incorporated in Malaysia with a minimum 51% local Malaysian equity, or consortia where at least one member is a company incorporated in Malaysia, with at least 51% local Malaysian equity.

Stock

1 month ago | Report Abuse

Folk, RHB Research said Sarawak is in a sweet spot to gain from foreign investments as the state has the most competitive unsubsidised electricity tariffs in Asean and business-friendly policies, while abundant RE sources have enabled it to attract foreign customers into Data centers.

Good news for Azio and with Sarawak Government support make it easier to find and lobby for customers into the Sarawak Data Centers Park.

Solar Energy Tenders Pending Announcement:

1. Sarawak Energy Tender- Request for Proposal for Front End Engineering Works for the Expansion of 160MW Floating Solar at Batang Ai. Tender closed on 31 July 2024.

2. Ministry of Energy Transition and Water Transformation for LSS-Energy Transition SuRiA - LSS5 5. Tender closed on 25 July 2024.

Stock

1 month ago | Report Abuse

Folk, with tremendous opportunities for Azio to secure jobs especially in Sarawak in the near future, buying at 0.135 & below is considered "a Steal" buy.

Now that with the mega project like Sarawak Data Center Park in the pocket, next will the the mega Floating Solar Farm projects.

Stock

1 month ago | Report Abuse

Beli simpan lalu kaya begulai 📈💰

Stock

1 month ago | Report Abuse

KUCHING (Oct 23): The water reservoirs at Bakun, Murum, and in the near future, Baleh, will provide huge areas for floating solar installations, said Sarawak Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg.

He said this huge potential of solar resources can be used to pump water and subsequently utilised to generate power during unavailability of the sunlight, thereby providing additional and sustainable energy for Sarawak.

“The reservoir for the hydropower provides potentially suitable sites for floating solar, which can be used with PHES (pumped hydro energy storage), thereby increasing further renewable energy generation from water resources,” he said.

Stock

1 month ago | Report Abuse

AIZO is aiming to be a full stack financial technology solutions provider in Malaysia, through their wholly owned subsidiary Techmile Resources Sdn Bhd (TRSB),

TRSB will be tailor-made to become a financial technology company that provides electronic payment system solutions such as alternative delivery channels to banks and financial institutions via secured electronic platforms for both micro and cross-border payments.

TRSB’s recent acquisition of Uniqa, meanwhile is aimed to transform TRSB into a full-stacked financial technology solutions provider in Malaysia which would allow it to provide financial technology support to clients and partners who offer remittance services to the Asian markets such as India, Bangladesh, Nepal, the Philippines, which are the top destinations for remittance from Malaysia.

For the record, Uniqa is an approved system provider under BNM section 40 of the Money Service Business Act with clients using its financial technology solutions needing BNM license approvals. Approval license from BNM for remittance payment services projected approval in 4Q24.

Uniqa currently has two local banks using its remittance system and is also working closely with its local partner bank to establish partnerships with a number of overseas banks in Indonesia, China, and the Philippines, as well as countries in the Middle East and Europe.

Stock

1 month ago | Report Abuse

Folks, over the last twelve months, AIZO Group Berhad's revenue grew by 2.7%. That's not great considering the company is losing money. In contrast, the share price took off during the year, gaining 190%.

It's good to see that AIZO Group Berhad has rewarded shareholders with a total shareholder return of 190% in the last twelve months.

Since the one-year TSR is better than the five-year TSR (the latter coming in at 11% per year), it would seem that the stock's performance has improved in recent times.

Someone with an optimistic perspective could view the recent improvement in TSR as indicating that the business itself is getting better with time.

Folks, it's now an open secret that Azio is the new hidden GEM in KLSE. The business will need a lot more growth to justify that increase. As such have patience when we investing a business through the stock market as "Patience Can Produce Uncommon Profits."

Stock

1 month ago | Report Abuse

1. Sarawak aims to have five data centres that will create further economic growth for Sarawak through cross-border data flow by 2030.

2. Sarawak aims to have solar energy make up 12 per cent of its total capacity mix by 2030.

3. Ongoing talks with Singapore and Indonesia remain productive, with Sarawak poised to play a significant role in supplying power to the grid and the grid’s infrastructure could be in place by 2030.

4. Sarawak we will have a new piping system throughout Sarawak at a cost of RM1.1bil by 2030.

5. Sarawak is targeting 60% student enrolment in science, technology, engineering and mathematics (STEM) by 2030.

6. Sarawak on course to become high-income state by 2030.

7. Sarawak launched the Second Sarawak Digital Economy Blueprint 2030 which will set out how the state will secure its future as a leading digital economy and society by 2030.

8. An estimated 7,000 telecommunication towers and structures will be needed to achieve full coverage in populated areas in Sarawak by 2030.

9. Sarawak aims to become net food exporter by 2030.

10. Azio remain committed to their goal of driving innovation and supporting Sarawak’s digital ambitions by 2030.



Stock

1 month ago | Report Abuse

Folks, Sarawak plans to develop additional floating solar projects at the Batang Ai, Bakun and Murum hydroelectric plant (HEP) reservoirs once the 1st phase of such project at Batang Ai completed this October'24.

1. The 2nd phase floating solar farm at the Batang Ai with a potential capacity of up to 160MW.

2. Bakun site with a potential capacity of up to 500MW.

3. Murum site with a potential capacity of 600MW.

There you go.

Stock

1 month ago | Report Abuse

SINGAPORE: Sarawak is set to take full advantage of Malaysia’s upcoming chairmanship of Asean next year to accelerate the establishment of the Asean Power Grid, a regional energy initiative that promises to enhance energy cooperation among Southeast Asian nations.

Abang Jo noted that ongoing talks with Singapore and Indonesia remain productive, with Sarawak poised to play a significant role in supplying power to the grid.

Abang Johari expressed optimism that Malaysia will use its position as the Asean chair next year to drive more focused and serious discussions on the Asean Power Grid.

“This has to be a joint decision among the Asean countries, and we only act as a power supplier. I am sure it will be finalised soon."

He also revealed that the grid’s infrastructure could be in place by 2030.

Abang Johari explained that the target for completing the infrastructure is set for 2030, as laying the submarine cables alone is expected to take at least three years.



Stock

1 month ago | Report Abuse

Sarawak Premier said noted that data centres need SUFFICIENT and RELIABLE SUPPLY OF ENERGY AND WATER as a cooling agent to enable them to function smoothly.

He said “You asked me if Google can go to Sarawak, it depends on Google. It’s not up to us to decide because basically what you want is the bottom line. If you can have the bottom line more in Sarawak, why not come to Sarawak?"

There you go folks, SUFFICIENT and RELIABLE SUPPLY OF ENERGY AND WATER and Tier 4 DC the highest standard for data centers—usually used by LARGE BUSINESSES, GOVERNMENT ORGANIZATIONS, and GLOBAL ENTERPRISES that require constant availability. That's the Bottom Line!

Stock

1 month ago | Report Abuse

Busy year ahead for RE players - Maybank IB
Being positive of the Renewable Energy (RE) sector, Maybank Investment Bank, said all LSS5 projects are scheduled to commence operations by 2026.

Potential EPCC contracts worth ~MYR7b
There are four packages available under LSS5 with project capacity ranging between 1MW-500MW each. Three out of the four packages are for rooftop or ground-mounted solar projects with an aggregate quota of 1.5GW. The 4th package is for floating solar projects with a total quota of 500MW.

The tender requires minimum Bumiputera or local Malaysian equity requirements to increase local participation in the RE industry.

Assuming EPCC works value of MYR3.6m per MW, we estimate the offered capacity is worth c.MYR7.2b in EPCC works.

Maybank IB expects the shortlisted bidders to be announced in 4Q24, after the deadline for proposals submission on 25 July 2024.

Stock

1 month ago | Report Abuse

Folks with the Sarawak Government support for the Sarawak Data Centre Park (SDCP), the opportunities given to Netrunner (design & technical aspects) and Aizo (infrastructure support, clean energy solutions, and water treatment facilities) will not be wasted and project to materialize in no time.

The final detail specifications & costing for the planned facility will only be shared with Sarawak Government first & relevant authorities prior the official announcement to Bursa Malaysia.

Folks, with the SDCP project in their pocket, there are other potential projects for AIZO likely to secure, that is the Solar Farm tenders & other Civil Engineering tenders to be known in November & December'24.

Stock

1 month ago | Report Abuse

Folks, what Is a Tier 4 Data Center?

1. Tier 4 data center security marks the highest standard for data centers—usually used by LARGE BUSINESSES, GOVERNMENT ORGANIZATIONS, and GLOBAL ENTERPRISES that require constant availability.

2. They have an uptime of 99.995%, meaning annual downtime of no more than 26.3 minutes/year.

3. They also feature 2N and 2N+1, fully redundant infrastructure, which is the second major difference between a tier 3 data center and the superior tier 4 data center.

- 2N redundancy means there is a completely mirrored system on standby, independent of the primary system.
- This means that should anything happen to a component in the main data center, there is an identical replica for every component ready to pick up the slack.
- This is by far the most robust form of security that can be employed.

4. All components are supported by two generators, two UPS systems, and two cooling systems. Each path is independent of the other, meaning that a single failure in one will not cause a domino effect with other components, as is the case with lower tiers.

5. Tier 4 data centers have a power outage protection of 96 hours, and this power must not be connected to any external source and must be independent. This is what’s referred to as “fault tolerance”—a capability that means that in the event of a system failure, IT operations aren’t affected in any way.

Folks, unlike tier 3, tier 4 data centers are prepared for unplanned maintenance—businesses that use tier 4 systems will often be unaware that an outage has taken place at all.

Potential clients: Sarawak government GLCs (SESCO, Affin, Bintulu Port, SEDC, & what not), International big IT organizations from China, Singapore, Japan, South Korea, etc, and Sarawak based big enterprises.

Stock

1 month ago | Report Abuse

SARAWAK is not one to be behind on the world’s latest trends that can propel the state towards the future. This can be seen by its myriad of initiatives that can revolutionise the state’s economy.

The recently concluded International Digital Economy Conference Sarawak (IDECS) 2024 is a fine example of this as it showcases what Sarawak hopes to offer from the aspect of technology and the digital economy.

Data centres, for one, is a global hot topic. They serve as catalytic enablers to raise Malaysia’s economic complexity and move up the technology ladder.

Malaysia is set to emerge as the largest data centre hub in the Asean region.
According to DC Byte, more than 1GW of supply is expected to come on stream over the next two years vs the current installed capacity of under 400MW.
About 3GW of capacity is in the developmental stages, and will be added progressively over the next three to five years.

Potential data centre inventory by 2028 would be 10 times more than what it took the industry to build over the last two decades.

This would put Malaysia ahead of Singapore, Asia’s largest DC metro where capacity is projected to stabilise at 1.4GW due to land scarcity and stricter conditions imposed on new builds.

Sarawak has been actively working to build up its data centre industry through several strategic initiatives.

Analysts with RHB Investment Bank Bhd (RHB Research) in a special report believed the state of Sarawak could well emerge as the next hotspot for data centres.

“This is due to the ample supply of hydroelectric power, growing investments in subsea cable infrastructure and its proximity to Nusantara, the new administrative capital of Indonesia located in East Kalimantan,” it said in the report.

And this prediction is coming to fruition: During IDECS 2024, Aizo Group Bhd, formerly known as Minetech Resources Bhd, signed a memorandum of understanding (MOU) with NetRunner Sdn Bhd to develop a Tier 4 data centre hub in Sarawak.

This hub aims to meet the increasing demand for secure and reliable data storage and processing facilities.

The MoU will bring together the strengths of each party to ensure the successful development of the data centres.

Netrunner, a special purpose vehicle focused on attracting investments for a state-ofthe-art data centres park in Sarawak, will lead the technical development and design of the Tier 4 Data Centres Park, ensuring it meets global standards in security, energy efficiency, and reliability.

Subsequently, Aizo will play a key role by providing infrastructure support, including the development of clean energy solutions and water treatment facilities to ensure the sustainability of the data centres’ operations.

By delivering secure, highperformance data management capabilities, the project is set to drive technological innovation, attract new investments, and bolster economic growth in the region.

“This MOU is a significant milestone for all parties involved, and we are excited to contribute to Sarawak’s advancement into the digital age,” commented Dato Abang Abdillah Izzarim, the executive chairman of Aizo, on the project.

“Working alongside the Sarawak Government and Netrunner, we believe that the Tier 4 Data Centres Park will become a cornerstone for the region’s digital infrastructure.

“Aizo is proud to play a role in supporting the growth of Sarawak’s digital economy and ensuring that this project has a lasting positive impact.”

Stock

1 month ago | Report Abuse

Folks, people often adopt a negative tone when talking about the stock market for several reasons:

Their Past Experiences: Many individuals who have repetitively experienced significant losses in the market may project their fears onto others, leading to a more pessimistic outlook.


Also during the stocks uptrend cycle they join the party late. They run after returns and almost always come in at the fag end of the party, by which time, the intelligent ones have already taken money off the table and the late comers are left selling at a huge substantial loss.

As such they tend to be a negative person due to their previous misfortune experiences.

Folks they That why they released their frustation in the forum.

Just ignore the noise and be patient, folk. Aizo will definitely added value to your investment in the near future.

Remember as Rome was not built in a day.









Stock

1 month ago | Report Abuse

Folks, what is a Tier 4 data center?

If compared to Tier 1, Tier 2 and Tier3, Tier 4 data centers is built to be completely fault tolerant, provide enterprise-level service for mission-critical infrastructure. They ensure that equipment will continue to operate safely in the event of any mechanical failure. Full redundancy and fault tolerance mitigate the risk of downtime and high levels of security offer protection. The temperature and humidity in the environment is consistently kept in the optimal ranges to provide maximum efficiency and extend the lifecycle of hardware. As the most expensive tier, Tier 4 customers are typically international organizations with extreme demand of services.

So far the irix DC in Santubong where Aizo Executive Chairman has interest, is the only Tier 4 Data Centre in Malaysia and is a carrier-neutral and green facility.

Folks with keen interest from the Sarawak Government to build digital infrastructure to support Sarawak digital economy, the Tier 4 data centers park projects will definitely materialize soon under the scope of Netrunner & Azio. This project will be done & tested in no time and no worries about that.

So now what the next "big thing" Azio going to secure for year 2024?

1. LSS5 successful bidders to be announced in November 2024 by the Ministry of Energy Transition and Water Transformation.

2. Sarawak Energy Tender Title: Request for Proposal for Front End Engineering Works for the Expansion of 160MW Floating Solar at Batang Ai. Tender closed on 31 July 2024.

3. Civil engineering works.

4.Aizo through their subsidiary, Uniqa (M) Sdn. Bhd. has secured the engagement of 2 Malaysian banks using its remittance payment services. Pending BNM approval by 4Q24.

5. Azio bituminousp have increased its total production capacity by 400MT per month to 1,000MT per month. The increase in total production capacity will enable Aizo to ride on the growing demand from the construction sector. This will undoubtedly unlock a new revenue driver for the Group.

As you know Rome was not build in a day so ignore the noise, be patient & see the value of your shareholding increase in a matter of time.

Stock

1 month ago | Report Abuse

Abang Johari said the Sarawak government is building a robust data ecosystem such as the Sarawak Integrated Operation Centre (SIOC) and the Open Data platform. These initiatives aim to harness diverse data for AI applications across various sectors, including healthcare, agriculture, and energy. By doing so, we are accelerating our digital economy and enhancing our sustainability efforts.

Working alongside the commitment from Sarawak government and NetRunner, AIZO believe that the Tier 4 data centre park will become a cornerstone for the region’s digital infrastructure.

With this project done & tested, let we focus in the next "big thing", the RE tenders which will be announced soon.

1. LSS5 successful bidders to be announced in November 2024 by the Ministry of Energy Transition and Water Transformation.

2. Sarawak Energy Tender Title: Request for Proposal for Front End Engineering Works for the Expansion of 160MW Floating Solar at Batang Ai. Tender closed on 31 July 2024.

Stock

1 month ago | Report Abuse

With the potential of AIZO to secure more jobs especially in Sarawak in the near future and thus adding value to the shareholders, slowly but surely the big funds like Sarawak State Financial Secretary, Amanah Saham Sarawak, Sarawak Sovereign Wealth Future Fund, EPF, PNB, KWAP & what not, will no doubt want a piece of the new gem in their investment portfolio.

Stock

1 month ago | Report Abuse

Aizo will provide infrastructure support, including the development of clean energy solutions and water treatment facilities to ensure the sustainability of the data centres' operations.

https://www.nst.com.my/business/corporate/2024/10/1120720/aizo-eyes-data-centre-development-sarawak

Stock

1 month ago | Report Abuse

Ignore the noise as on your road to success you will likely encounter a lot of distractions from 🐦🐺 .

Your patience and discipline will be rewarded by investing a new gem in KLSE for year 2024-2025.

Stock

1 month ago | Report Abuse

Folks, investing in AIZO should be more like watching paint dry or watching grass grow. If you want excitement, take your money to Genting...😂

The man who follows the crowd will usually go no further than the crowd. The man who walks alone is likely to find himself in places no one has ever been before.

Remember folks, Rome was not built in a day and AIZO as the new gem will shine for the year 2024-25.

Stock

1 month ago | Report Abuse

Folks, focus only on finding the next Market's greatest winner that is AIZO. Ignore the noise and exercise discipline. Remember folks, be patient as ROME was not built in a day.

Stock

1 month ago | Report Abuse

Projects in the pipeline.

1. LSS5 winners to be announced in November 2024 by the Ministry of Energy Transition and Water Transformation.

2. Sarawak Energy Tender Title: Request for Proposal for Front End Engineering Works for the Expansion of 160MW Floating Solar at Batang Ai. Closing Date: 31 July 2024. Pending announcement on the successful tenderer soon.

3. Uniqa a remittance payment services is in progress of getting a license approval from BNM soon. Potential client would be Sarawak Government, Local & International banks & State GLCs (Bintulu Port, Affin, Sarawak Energy, Sarawak Airlines, etc).

Just to name a few, folks!

Stock

1 month ago | Report Abuse

Optimistic Outlook for Aizo

1. Civil Engineering Way Forward
Looking ahead, the construction sector will continue growing positively this year, spurred by a budget
allocation totalling RM180 billion for development works from both the public and private sectors. The Group remains steadfast in actively pursuing project tenders and acquiring new project opportunities to replenish our order book particularly on their core business segments of mining, civil works and infrastructure projects.

2. Bituminous Product Way Forward
Minetech Asphalt Man International Sdn. Bhd.’s ("MAMI") have increased its total production capacity by 400MT per month to 1,000MT per month. The increase in total production capacity will enable MAMI to ride on the growing demand from the construction sector. This will undoubtedly unlock a new revenue driver for the Group.

3. Renewable Energy Way Forward
It is pertinent to note that LSS5 stipulates the minimum Bumiputera and local Malaysian equity requirements, reflecting the Government’s intention to increase local participation in the RE sector. Towards this end, Aizo, confident with their competitive pricing, is working diligently to secure another large-scale solar award from the Ministry of Energy Transition and Water Transformation (Malaysia Energy Commission).

4. Financial Technology Way Forward
Aizo through their subsidiary, Uniqa (M) Sdn. Bhd. has secured the engagement of 2 Malaysian banks using its remittance payment services. It is also establishing partnerships with several overseas banks in Indonesia, China, the Philippines, the Middle East, and Europe. Uniqa is currently applying for a remittance licence with Bank Negara Malaysia (“BNM”). This move will allow Uniqa to launch its own remittance mobile application. The licence application is still pending approval from BNM.

5. Folks projects already in the pipeline only waiting for the announcements and LSS5 winners to be announced in November 2024 by the Ministry of Energy Transition and Water Transformation will be one of the several projects.

Stock

1 month ago | Report Abuse

Folks, Hong Leong Investment Bank (HLIB) research estimates that solar engineering, procurement, construction and commissioning (EPCC) jobs from Large Scale Solar 5 (LSS5) alone will hit RM7 billion.

The fifth bidding cycle of the Large Scale Solar (LSS5) programme making a comeback with a significantly upsized quotas of 2GW (floating solar: 500 megawatt (MW), was a key highlight.

The Ministry of Energy Transition and Water Transformation, through the Energy Commission will announce the WINNERS for the fifth round of the large scale solar (LSS5) programme in November this year - https://theedgemalaysia.com/node/729472

Given Aizo unique position into renewable energy, via its 9.99 MWac floating solar plant in Manjung, Perak, the Group is confident that Aizo will play a role in the delivery of projects of national importance, such as the LSS5 - Annual Report 2024

Malaysia’s Energy Commission has recently announced the opening of the fifth Large Scale Solar competitive bidding process, known as ‘LSS-Peralihan Tenaga SuRia’ or ‘LSS PETRA’ - Annual Report 2024

It is pertinent to note that LSS5 stipulates the minimum Bumiputera and local Malaysian equity requirements, reflecting the Government’s intention to increase local participation in the RE sector. Towards this end, the Group, confident in our competitive pricing, is working diligently to secure another large-scale solar award from the Energy Commission - Annual Report 2024

Folks projects already in the pipeline only waiting for the announcements and the above will be one of the several projects.

Stock

1 month ago | Report Abuse

In April this year, the Ministry of Energy Transition and Water Transformation, through the Energy Commission, announced the offer of a solar quota of 2,000 megawatts (MW), through a competitive bidding process under the next phase of the LSS programme.

The Energy Commission will announce the winning bids for the fifth round of the large scale solar (LSS5) programme in November 2024.
https://theedgemalaysia.com/node/729472

Stock

2024-07-05 16:01 | Report Abuse

Folks as per Bursa listing requirements for the Share Issuance Scheme, the total number of shares to be issued is not more than 15% (+-267,000,000) of its total number of issued shares & probably with a vesting period of 5 years to exercise the offer.

Once everything is in place to acquire more shares thru SIS at a 10% discounted based on the 5 day weighted average market price, only then a more positive announcements will surface thus creating value to the stakeholders, especially to the substantial majority shareholder & his proxies. 😀

As I have mentioned earlier time is on his side as he & his group have the knowledge of projects in the pipeline.

Once the date of SIS offer made known to Bursa, only then buying & selling transactions will be active in order to determine the 5 day weighted average market price.

The big question folks do you have money, patient & time for the AIZO to deliver as what Warren buffet said “the stock market is a device to transfer money from the impatient to the patient.” 😀

Stock

2024-07-05 11:20 | Report Abuse

With less sellers at the lower prices only then they will offer to buy at a slightly higher price.

Folks, with time on their side & once everything is in place, only then the good news are out in the market.

Stock

2024-07-05 11:07 | Report Abuse

Folks, probably Abg groups & proxies have been & still actively buying in the open market using "nibble strategy" as not to raise the price too high while maximizing other option such as SIS to acquire more shares as they are the only party who know the future potential growth for Aizo Group.

As I have mentioned before Minetech is in the accumulation phase, folks!

Stock

2024-07-05 10:07 | Report Abuse

Folks, the objectives of the Scheme :

(i) to drive and motivate the Eligible Persons to work towards achieving the Group’s goals & objectives

(ii) to reward the Eligible Persons in recognition of their contribution to the operations & continued
growth of the Group

(iii) to retain the Eligible Persons by giving them a sense of ownership, loyalty & belonging to the Group by enabling them to participate directly in the equity of the Company

(iv) to align the interests of the Eligible Persons with the interests of the Shareholders by providing an incentive for the Eligible Persons to participate in the future growth of the Group & motivating them towards achieving better performance

(v) provide a continuing incentive to the Eligible Persons without adversely affecting the cash flow of the Group

Folks, the Exercise Price of each new Share shall be determined by the SIS Committee & fixed based on the 5 day weighted average market price of the Shares, at the Date of Offer, with a discount of not more than 10%.

The Proposed SIS will not have an effect on the NA & gearing of the Group until such time when the SIS Options are granted and/or exercised.

Any potential effects on the NA & gearing of the Group from the Proposed SIS will depend on the number of SIS Options to be granted & exercised, & the Option Price.

There you go, folks!

Stock

2024-07-03 15:48 | Report Abuse

Folks, Minetech in the accumulation stage for almost a month.

Just as the accumulation is characterized by support & resistance levels containing the price action of a stock, the markup stage is identified by the share price rallying above the resistance level.

So folks, with the support level at 0.140 sen while the resistance level at 0.160 sen & soon with a couple of promising announcements, will the share prices go lower or higher?

Stock

2024-07-03 10:02 | Report Abuse

Folks, accumulation is the stage when institutional investors begin to accumulate Minetech shares as these major players who need to acquire large positions in Minetech but can't do it all at once for fear of driving prices higher & raising their cost basis.

So folks, they buy at regular intervals when the stock hits their desired price levels thus this supports the stock & moves it up slightly & then they wait for the move to be digested & the price to come back to their target level before repeating the process.

During this stage folks, few retail investors might participate because price action is unremarkable & doesn't necessarily attract attention.

But on the other hand, this is where long-term investors & the believers able to position themselves to scale in to take advantage of Minetech price movements.

So folks a "bite-sized" approach can sometimes be a better choice than buying everything at once, in anticipation of an announcement that could cause a shift in the markets.

There you go folks !

Stock

2024-06-27 10:58 | Report Abuse


Folks, pullbacks are widely seen as "buying opportunities" after a stock has experienced a large upward price movement.

For example, a stock may experience a significant rise following a positive promising announcement & then experience a pullback as traders with existing positions take the profit off the table, i.e., selling some or all of their long positions.

Most pullbacks involve a stock’s price moving down to an area of technical support before resuming the uptrend.

Remember folks, pullbacks typically don’t change the underlying promising fundamental narrative that is driving the price action on a chart as pullbacks are usually profit-taking opportunities following a strong run-up in a stock’s price.

Trend-following traders frequently use pullbacks to get in on the dominant uptrend as they can do this through buy limit orders, stop buy entry orders, or just a plain market order if they want to jump right in.

So folks, if the promising fundamental picture for a company has not changed significantly, it increases the likelihood that it's just a normal pullback that should stabilize over a few sessions, & offer buyers a chance to get in on the primary uptrend at a cheaper price.

There you go, folks!

Stock

2024-06-26 10:21 | Report Abuse

Folks, if you feel the stock has fallen because the market has overreacted to something, then buying more shares should be a good thing.

Averaging down works best when you are confident that an investment is a long-run winner.

As such, buying the dips will have you accumulating your position at progressively better prices, making your ultimate profit potential greater.

My only advice to the believers is to buy now when its cheap before the big funds like Sarawak Treasure, EPF, KWAP, ASB, PNB, TH start to use "nibble" strategy before taking further action.

To the non believer you can skip this stock & if you are holding this stock please sell immediately. 🤣



Stock

2024-06-26 10:01 | Report Abuse

Folks, Sarawak Energy aims to install at least 400 megawatts (MW) of floating solar power capacity at its dams (Batang Ai, Murum, & Bakun) by 2030.

The company owned by the Malaysian state of Sarawak, which produces most of its power from hydroelectric dams, is expanding into solar capacity as it seeks to reduce reliance on coal.

Sarawak Energy started construction at its first phase 50 MW floating solar unit at its Batang Ai dam which is expected to be completed by end-2024.

Soon after feasibility study and environmental & social impact assessment approval given, the second phase of 160MW Floating Solar at Batang Ai will be the next big thing.

Folks, there are plenty of opportunities for Minetech in Sarawak either its in Civil Engineering, Solar Energy, Mining or even Digital Infra (Satellite).

The future for Minetech looks promising as such there has been no fundamental change to Minetech & buying more share at a lower price open a great opportunity to scoop up some more stock at a bargain.

There you go folks!

Stock

2024-06-25 12:16 | Report Abuse

Tender Title: Request for Proposal for Front End Engineering Works for the Expansion of 160MW Floating Solar at Batang Ai. The Proponent should have proven experience and expertise in the design
and engineering of floating solar project;

The Front-End Engineering Works for the expansion of 160MW Floating Solar at Batang Ai consist of the following phases:
i. Phase 1 – Feasibility Study (including ground works such as soil investigation, topographical survey, LiDAR survey, bathymetry survey, underwater soil sampling)
ii. Phase 2 – Environmental & Social Impact Assessment (ESIA) to meet International Standards and Natural Resources and Environment Board (NREB) EIA for local NREB submission.

Closing Date: 31 July 2024.

Folks, this showed the Premier is serious on building the 2nd phase 160MW Floating Solar Farm during his visit to Batang Ai recently.

The Minetech 9.9MW floating solar farm in Perak was built at the cost of Rm55 mil.

Now what will be the cost of building a 160MW Floating Solar Farm in Batang Ai, Folks?

Beside that Sarawak also planning to deploy floating solar technology at its other reservoirs, such as Bakun and Murum.

Slowly & surely Minetech will increase the stock value for the stakeholders.

Good things come to those who wait.

Better things come to those don't give up.

Best things come to those who believe.

Stock

2024-06-25 11:49 | Report Abuse

Tender Title: DESIGN, ENGINEERING, PROCUREMENT, MANUFACTURE, SUPPLY, DELIVERY, INSTALLATION, TESTING & COMMISSIONING AND HANDOVER OF COMPLETELY BUILT-UP (CBU) FIFTY-FIVE (55) UNITS OF SINGLE DECK HYDROGEN FUEL CELL FEEDER BUSES (H2B) FOR THE DEVELOPMENT OF THE KUCHING URBAN TRANSPORTATION SYSTEM (KUTS) PROJECT.


Closing Date: 12 July 2024 (Friday) before 12:00 Noon

JV with China Co? Plenty of opportunities for Minetech in Sarawak, folks!

Stock

2024-06-24 16:44 | Report Abuse

Folks, I still have buy Qs at 0.13 sen & buy Qs at 0.12 sen.

Slowly & surely Minetech/Aizo will increase the stock value for stakeholders.

Good things come to those who wait.

Better things come to those don't give up.

Best things come to those who believe.

Stock

2024-06-20 22:42 | Report Abuse

Folks, Sarawak Energy Berhad (SEB ) Group chief executive officer is exploring the feasibility of a second phase of its floating solar project at Batang Ai in Lubok Antu, Sri Aman & said this will have the potential capacity to generate up to 160MW of renewable electricity.

Additionally, SEB is also considering deploying floating solar technology at its other reservoirs, such as Bakun and Murum.

With all the effort & planning in place, SEB well-positioned to support Sarawak’s goal of achieving 10GW generation capacity by 2030.

SEB plans to invest up to RM5 billion per annum over the next 10 years in generation, transmission, & distribution projects.

Funding for these projects has been secured through a mixture of internally generated funds & a successful RM3.5 billion issuance under SEB’s RM15 billion Sukuk programme, which has received an AAA credit rating from RAM Rating Services Berhad.

Folks, there abundant of opportunity for Minetech/Aizo to venture whether in the near term, medium term or long term.

Slowly but surely Minetech/Aizo will increase the stock value for shareholders.

Good things come to those who wait.

Better things come to those don't give up.

Best things come to those who believe.

Stock

2024-06-20 18:15 | Report Abuse

Sarawak Energy Bhd (SEB) current floating solar farm project at Batang Ai would generate 50MW once completed in October 2024 through a joint venture with China Power International Holdings and Trina Solar.

The 86-hectare ongoing solar farm project currently occupies only 2% of the reservoir’s total surface area of 8,500 hectares, suggesting considerable room for expansion.

"From my calculations, if we use 60% of 8,500ha, the potential solar energy we can produce is about 2,000MW. I have shared this with SEB so that we can plan an increase in Batang Ai’s solar power generation capacity and I believe they will research this proposal” according to Sarawak Premier.

Moreover, Sarawak Premier also mentioned that the state government would explore additional floating solar projects at the Bakun and Murum reservoirs, which have potential capacities of 500MW and 600MW, respectively.

Since Sarawak has signed a memorandum of understanding with (renewable energy company) Masdar from the United Arab Emirates, who are interested in developing solar energy form a joint venture with Minetech/AIZO for the above proposal?

There you go folks https://focusmalaysia.my/sarawak-eyes-expansion-in-floating-solar-power-at-batang-ai-hep/

Stock

2024-06-20 15:54 | Report Abuse

Remember folks, there are abundant of opportunity in the Borneo Island esp Sarawak.

With a new EC as majority shareholder, soon new BODs management team & later licenses needed from the local & federal authorities for the new ventures, Aizo will surely position itself as one of the key player is Borneo esp Sarawak.

My only advice to the believers of AIZO is to buy now when its cheap before the big funds like Sarawak Treasure, EPF, KWAP, ASB, TH start to use "nibble" strategy before taking further action.

To the non believer you can skip this stock & if you are holding this stock please sell immediately 🤣.

There you go folks.

Stock

2024-06-20 14:38 | Report Abuse

Just like Alon Musk launching thousands of statellites for Starlink to provides internet services, Aizo probably on the other hand is planning to launch a satellite as per Sarawak vision & mission, aimed at rural communities who cannot get high-speed internet connectivity.

The satellite will be put in low-level orbit around the Earth to make connection speeds between the satellites & the ground as fast as possible.

Using satellite solves the problem of getting internet connections to remote locations in Sarawak, Sabah & Kalimantan (Borneo Island) bypasses the need to build massive amounts of infrastructure, like cables and masts, to reach those areas as satellite link used the dish and router to connect to the satellite.

Compared to standard internet providers, satellite link connection isn't cheap.

In Sarawak the cost using satellite link connection plus the monthly charges to the vast rural areas in state most probably will be borne by the Sarawak State government.

If Alon Musk can do it, so can Aizo folks.

Stock

2024-06-20 10:24 | Report Abuse

Sarawak planning to launch its own satellite, bridging the digital divide across the rural communities by providing access to broadband connectivity, so that all Sarawakian have equal opportunities to participate in the economy.

That where Aizo appetite will be folks...in collaboration with Sarawak Satellite, digital infra, gateway & data centre.

Abundant opportunities for Aizo to venture including mining collab & RE too.

Slowly but surely Aizo will increase the value for shareholders.

Good things come to those who wait.

Better things come to those don't give up.

Best things come to those who believe

Stock

2024-06-19 20:48 | Report Abuse

Yes…soon new BoDs n management team.

Stock

2024-06-19 14:38 | Report Abuse

Folks, good things come to those who wait.

Better things come to those don't give up.

Best things come to those who believe.

Stock

2024-06-19 14:11 | Report Abuse

Folks, Deputy Premier recently led a Sarawak delegation for a visit to Micassa Gold Mine in Canada, which is among the biggest gold mines with the highest grade in the world which is operated by Agnico Eagle Mines Limited.

Deputy Premier said Sarawak welcomed Agnico Eagle Mines Limited to explore opportunities particularly in mining.

Minetech subsidiary Minetech Construction Sdn Bhd has the expertise for waste removal, ore delivery, & associated works as proven for the ongoing works in the Selinsing Gold Mine Project, Pahang.

So the big question, will Agnico Eagle Mines Limited extend a partnership to Minetech for waste removal, ore delivery & associated works.

Remember folks that mining job in Sarawak is estimated to be RM1.25 trillion worth of gold, rare earth, bauxite, & other precious metals covering 12.4 million hectares land areas within the state.

So folks, Minetech a civil engineering specialist, bituminous products manufacturer as well as an emerging player in the solar energy space, has so much opportunities in Sarawak.

Folks, 0.13 sen soon & 0.20 sen later will be history.

Stock

2024-06-13 15:57 | Report Abuse

Folk, an investor needs to sharpen their skills of finding gems in the stock market.

They need to be able to identify companies with good potentials but have yet to be discovered by the market especially by big institutions.

Minetech is one of the gem at a discounted price now.