Followers
0
Following
0
Blog Posts
0
Threads
289
Blogs
Threads
Portfolio
Follower
Following
2021-09-03 09:21 | Report Abuse
resistance 10c to break soon
2021-09-03 09:21 | Report Abuse
good FA compare to other penny stock
2021-07-23 10:14 | Report Abuse
they collect before they pump.just wait the rocket launching
2021-07-16 14:49 | Report Abuse
Government of Malaysia Acceptance and Commissioning of TracAPM, SafeTravelPass and MyABC19 as the official government systems [14 July 2021]
SafeTravelPass, TRACVIRUS, Technology support (C) Copyright 2021 Tri-G Technologies Sdn Bhd (subsidiary of Nexgram Group)
2021-06-29 16:30 | Report Abuse
they will update after 5pm.stay tune
2021-06-29 16:28 | Report Abuse
after 5pm news tomorrow limit up
2021-06-16 08:52 | Report Abuse
PP cuci duit.projek haram penipu takda
2021-06-09 11:07 | Report Abuse
cannot imagine.already happen maa. 80c to 4c. hahahaha.u semua kena con
2021-06-04 10:51 | Report Abuse
shake shake shaking shake shake shaking weak retailer.hahahha
2021-06-04 10:24 | Report Abuse
now the syndicate out to buy lower
2021-05-29 08:06 | Report Abuse
milo ais pon sedap.ini dah jadi air longkang
2021-05-28 15:56 | Report Abuse
kasi pump la kanasai.miskin punya syndicate
2021-05-27 10:10 | Report Abuse
12.5 make u panic. ALL IN! hahaha
2021-05-25 11:53 | Report Abuse
relax.the time will come like sedania or dataprp..lol
2021-05-25 10:49 | Report Abuse
so when this shares will go up? last year is rm1, then go back to 80c.now sleep back
2021-02-26 14:07 | Report Abuse
bukan 3 la. from 5 to 1.8 ..lol
2021-02-25 13:52 | Report Abuse
you make your another own virus that can become another pandemic only can spike gloves back
2021-02-08 12:52 | Report Abuse
sama macam DGB da... waiting at 8c.hahahhaha
2021-02-04 10:52 | Report Abuse
The salient terms of the Contract Award are, as set out below:
(i) The scope of works of PSB included but not limited to the followings:-
a) Foundation Piling Works;
b) Four storey office building (exclude structural steel works);
c) All associated infrastructure works;
d) All associated mechanical and electrical works; and
e) Overall Project Management.
(ii) The overall contract period, excluding building of lift, shall be three (3) months from the
commencement date, which is February 2021
2021-02-04 10:52 | Report Abuse
The Board of Directors of Pasukhas (“Board”) wishes to announce that Pasukhas Sdn Bhd
(“PSB”), a wholly-owned subsidiary of the Company, had on 2 February 2021, accepted a letter
of award from AT Glove Engineering Sdn Bhd (“ATGE”), to design and build a four storey office
building located at Lot 207448 & 207449, Jalan Chepor 11/7, Kawasan Perusahaan Seramik
Chepor, 31200 Mukim Hulu Kinta, Daerah Kinta Perak (“the Contract Award”) with a contract
value of approximately RM2.738 million (“Contract Value”).
2021-02-04 10:29 | Report Abuse
will fly soon.many project coming
2021-01-29 09:46 | Report Abuse
KUALA LUMPUR (Nov 11): Brahim’s Holdings Bhd is collaborating with Focus Dynamics Group Bhd for the Digital Kitchen Project, a venture in the on-demand food and beverage (F&B) industry, amid an expected increase in demand for e-commerce-based food delivery services due to the COVID-19 pandemic.
In a statement, the two companies said their respective wholly-owned subsidiaries Brahims SATS Food Services Sdn Bhd and Focus Dynamics Centre Sdn Bhd had entered into a Heads of Agreement for the venture.
Under the partnership, Focus will leverage Brahim’s existing central kitchen, logistics and supply infrastructure to create a central kitchen which will service several “silos” of the project, which comprise Shadow Kitchen Network services, Cloud Kitchen, Ready-to-Eat Meals and Digital Food Trucks.
Meanwhile, Focus will be responsible for the technology side of the venture.
A portion of Brahim’s 59,000-sq metre central kitchen will be used to build and house the Shadow Kitchen Network services, which will prepare ready-to-eat meals and food supply boxes.
The Shadow Kitchen Network will comprise existing restaurants throughout the Klang Valley which are not operating at regular capacity, acting as the fulfilment arm for Focus.
A separate part of the central kitchen will be used to set up a Cloud Kitchen, which aims to attract entrepreneurs and small businesses interested in the digital F&B business.
Brahim’s will also revamp its existing infrastructure and logistics for the Digital Food Trucks segment with remodeled food trucks equipped with digital menus, which is expected to be launched next year.
“This collaboration provides a solid foundation to potentially cater up to 60,000 meals per day, through various silos of operations, all prepared and packaged at the central kitchen, and delivered to consumers’ doorsteps via direct delivery or through the Shadow Kitchen Network,” said Focus executive director Benson Tay Ben Seng.
“Our long-term plan is to automate the entire chain, capturing revenue and margins for all aspects of the digital F&B industry for the Klang Valley area. With a kitchen of this size and collaboration with Brahim’s, which already has an existing supply chain network, this grand plan is one step closer to being achieved,” he added.
Brahim’s share price closed up 0.5 sen or 1.85% at 27.5 sen, giving it a market capitalisation of RM64.98 million.
Focus Dynamics closed up one sen or 1.27% at 80 sen, bringing its market capitalisation to RM4.91 billion.
2021-01-26 09:16 | Report Abuse
26/01/2020 price = 85 cents
2021-01-25 17:15 | Report Abuse
sleeping dragon almost a year
2021-01-23 07:39 | Report Abuse
monday another round.last minute taking profit yesterday
Stock: [KGROUP]: KEY ALLIANCE GROUP BERHAD
2021-09-06 09:08 | Report Abuse
to the mooon.revenue up