sudah kaya ka eric_B5B? KATAKAN AKU CINTA PADA AYAMTUA! kikiki hihihihi kokokokoko eric_B5B tomolo buy zelan !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
mesti yakin, doa dan iman (serta jantung) mesti kuat .... nothing impossible... $1.00? $2.00 $3.00 ? pick a price............ POSITIVE MINDSET! hihihihihihihi
40 ct this week.......50 cts - 60 cts 2 wks later .......We need more sharks to come in n join.... 60 cts no sweat..Maybe can shorten leadtime ...This company is making a comeback ..like it or not ?? Stay invested !
Posted by Lz Lee Weiping > Aug 5, 2014 12:43 AM | Report Abuse
ayamtua - ZELAN Stage 2 of cycle, bullish, it has broken it's resistance level of 0.33/0.335 and 0.345. Now it's has a support level of 0.345 and 0.33. Resistance level of 0.385 and 0.360. It's now re-testing it's resistance level of 0.360, if it break it, it will be expect that it will re-test 0.385. TP at 0.44 and 0.48. Stop-loss of 0.31.
Posted by Lz Lee Weiping > Jul 29, 2014 11:47 AM | ayamtua - ZELAN Has a resistance level of 0.33/0.335 and 0.345. Support level of 0.305 and 0.29. It formed a double bottom with a low of 0.17 and a peak of 0.325. It needs to close above 0.325 to confirm it's bullish-ness. It's expected to re-test it's resistance level of 0.33/0.335 and 0.345. TP of 0.44 and 0.48. Stop-loss of 0.24.
Posted by Lz Lee Weiping > Aug 5, 2014 12:43 AM | Report Abuse
ayamtua - ZELAN Stage 2 of cycle, bullish, it has broken it's resistance level of 0.33/0.335 and 0.345. Now it's has a support level of 0.345 and 0.33. Resistance level of 0.385 and 0.360. It's now re-testing it's resistance level of 0.360, if it break it, it will be expect that it will re-test 0.385. TP at 0.44 and 0.48. Stop-loss of 0.31.
Zelan Bhd unit Zelan Construction Sdn Bhd (ZCSB) has received a contract from the East Coast Economic Region Development Council for the construction of the RM248.7mil drawbridge connecting Muara North and Muara South in the Kuala Terengganu city centre. The overall length of the bridge is 632 metres, with a width of 23 metres. The clear span of the drawbridge is 50 metres long. A statement to Bursa Malaysia said that the contract duration was for 135 weeks, commencing on the date for possession on Aug 13. (StarBiz)
Zelan: To win MYR250m ECER job. Zelan is expected to bag a MYR250m contract from the East Coast Economic Region (ECER) for the construction and completion of a drawbridge connecting Muara North and Muara South in Kuala Terengganu. Zelan is partnering Hasrat Sedaya Sdn Bhd, an engineering company specializing in bridge construction. They have a 70% and a 30% equity interest in the joint venture respectively. (Source: The Edge Financial Daily)
Zelan Berhad ("Company") would like to announce that its fully owned subsidiary, Zelan Construction Sdn Bhd ("ZCSB"), has received a Letter of Award from PETRONAS Refinery and Petrochemical Corporation Sdn Bhd ("PRPCSB") for Contract No.: RAPID/CTC/21-2013-P20B1 for the Provision of Basic Design, Detail Engineering, Procurement, Construction & Commissioning ("BEPCC") of Material Off Loading Facilities ("MOLF") Jetty at Tanjung Setapa for Refinery and Petrochemical Integrated Development ("RAPID") Project at Pengerang, Johor ("Works").
The Contract Price is RM248,499,647.93 for the Scope of Works which is based on:
(a) lump sum with breakdown as per itemized cost given in Schedule of Prices; and
(b) provisional sum based on Bill of Quantity and Schedule of Rates.
The contract duration for the Works is 18 months.
The MOLF Jetty is intended to be used for import of Heavy Lift Oversized ("HLO") and Super HLO equipment and materials as well as some break-bulk and containerized cargo during the implementation of the RAPID Project.
None of the directors and/or major shareholders of the Company, or persons connected with them, has any interest, direct or indirect, in the above contract.
FXLee- stay here (zelan forum).. and in IFCAMSC forum, and in KGB (forum) - you will be a superstar predictor of the future! it's funny to predict future news, today! .. kikikikiiiiiii
Reference is made to the Announcement dated 17 June 2014 in relation to the extension of 30 days requested by Meena Holdings LLC ("MH"), the owner of Meena Plaza Mixed Use Development Project in Abu Dhabi, United Arab Emirates, for MH to comply with its obligation in the SSA to provide Zelan Holdings (M) Sdn Bhd ("ZHSB") with a document from MH's financier demonstrating MH's readiness of financing as supported by a signed copy of the loan agreement between MH and its financier evidencing that the financing is available for drawdown.
Zelan Berhad would like to announce that ZHSB has on 16 July 2014 received a letter from MH, requesting a further extension of 60 days for MH to comply with its abovementioned obligation. Upon due consideration of MH's request, ZHSB has on 17 July 2014 responded to MH, giving an extension of 30 days.
Accordingly, the relevant timings in the SSA, including the Payment Date and Recommencement Date (both of which are defined in the Announcement dated 15 April 2014), will be adjusted for the same duration.
1 ) Zelan Bhd unit Zelan Construction Sdn Bhd (ZCSB) has received a contract from the East Coast Economic Region Development Council for the construction of the RM248.7mil drawbridge connecting Muara North and Muara South in the Kuala Terengganu city centre. The overall length of the bridge is 632 metres, with a width of 23 metres. The clear span of the drawbridge is 50 metres long. A statement to Bursa Malaysia said that the contract duration was for 135 weeks, commencing on the date for possession on Aug 13. (StarBiz)
2 ) Zelan Berhad ("Company") would like to announce that its fully owned subsidiary, Zelan Construction Sdn Bhd ("ZCSB"), has received a Letter of Award from PETRONAS Refinery and Petrochemical Corporation Sdn Bhd ("PRPCSB") for Contract No.: RAPID/CTC/21-2013-P20B1 for the Provision of Basic Design, Detail Engineering, Procurement, Construction & Commissioning ("BEPCC") of Material Off Loading Facilities ("MOLF") Jetty at Tanjung Setapa for Refinery and Petrochemical Integrated Development ("RAPID") Project at Pengerang, Johor ("Works").
3 ) Reference is made to the Announcement dated 17 June 2014 in relation to the extension of 30 days requested by Meena Holdings LLC ("MH"), the owner of Meena Plaza Mixed Use Development Project in Abu Dhabi, United Arab Emirates, for MH to comply with its obligation in the SSA to provide Zelan Holdings (M) Sdn Bhd ("ZHSB") with a document from MH's financier demonstrating MH's readiness of financing as supported by a signed copy of the loan agreement between MH and its financier evidencing that the financing is available for drawdown.
Zelan Berhad would like to announce that ZHSB has on 16 July 2014 received a letter from MH, requesting a further extension of 60 days for MH to comply with its abovementioned obligation. Upon due consideration of MH's request, ZHSB has on 17 July 2014 responded to MH, giving an extension of 30 days.
Accordingly, the relevant timings in the SSA, including the Payment Date and Recommencement Date (both of which are defined in the Announcement dated 15 April 2014), will be adjusted for the same duration.
This book is the result of the author's many years of experience and observation throughout his 26 years in the stockbroking industry. It was written for general public to learn to invest based on facts and not on fantasies or hearsay....
chkee17
58 posts
Posted by chkee17 > 2014-08-04 16:17 | Report Abuse
fly up to sky.