Followers
18
Following
0
Blog Posts
0
Threads
46,621
Blogs
Threads
Portfolio
Follower
Following
3 days ago | Report Abuse
Haha back to Jtiasa :
Haha Konartist sslleee own claimed TA n FA Guru ..can brief forumers here is Jtiasa waves 2 is coming ? same as you said in Yinson ( thinking waves 2 is Up but is Down ) .
From Stoch RSI chart ..previous 2 cycles upon reached 80 , Fast line shl divergent down cross below Slow line ..this round even did not reach 80 oredi divergent down but did not cross below Slow line …
So Konartist sslleee TA Gutu ..today Jtiasa Fast line shl be Divergent Up or further Divergent down cross below Slow line ?
Is previous 2 cycles for unloading process ???
3 days ago | Report Abuse
Haha even when I am posting in YTLpower with Negative views facts n figures… I am posted to learn TA skill for Entry Timing ..
3 days ago | Report Abuse
Haha I never own claimed TA n FA Guru like Konartist Ssllee …even ethical Sifu 3iii said learned 50 years …
2nd V.P Case Study in PA on 2021 with 2 objectives :
👉 a) To share n learn Investment knowledge n skills as Newbie n ikanbilis.
👉 b ) To Exposé kon man n actor…
3 days ago | Report Abuse
Haha I learned when MACD both lines are surfaced from Water Level with strong momentum.. then Stoch RSI is the factor …
3 days ago | Report Abuse
Haha back to Jtiasa :
Haha Konartist sslleee own claimed TA n FA Guru ..can brief forumers here is Jtiasa waves 2 is coming ? same as you said in Yinson ( thinking waves 2 is Up but is Down ) .
From Stoch RSI chart ..previous 2 cycles upon reached 80 , Fast line shl divergent down cross below Slow line ..this round even did not reach 80 oredi divergent down but did not cross below Slow line …
So Konartist sslleee TA Gutu ..today Jtiasa Fast line shl be Divergent Up or further Divergent down cross below Slow line ?
Is previous 2 cycles for unloading process ???
3 days ago | Report Abuse
Haha just like Kidd story teller Buy what u Not Understand posted the Serba subsidiaries screenshot.( did not know yet he promoted Serba )…. I found variance between his thread n the screenshot… Konartist sslleee defended him before he reply …🤣
3 days ago | Report Abuse
Haha konartist sslleee oredi had few record on his holding list with lies .. eg Bplant list …
3 days ago | Report Abuse
Haha as posted earlier.., Jaks got the stock MOAT after is successfully diversified into Power generator industry ( Vietnam JV Power Plant 1200 MW EPCC RM 8.7 billion) ..
And into RE Solar : LSS4 50 MW and CGPP 30 MW . .. Jaks Shl be getting the MOAT of efficient scale if succeeded in LSS5 tender 200 MW ( with intention up to limit 500 MW ) .
3 days ago | Report Abuse
Posted by Mikecyc > 13 hours ago | Report Abuse
Haha Konartist sslkeee still did not check what is my Jaks cost during you posted queue buy Insas WC at RM 0.25 in Insas forum .. today Insas WC price RM 0.155 … how many digits you Loss in Insas WC oredi !🤣🤔
—/
Posted by Sslee > 5 minutes ago | Report Abuse
The fact is while I'm looking at how many digits book gain with my jayatiasa and someone is licking his wounds looking at his how many digits book lose in jaks.
Posted by Mikecyc > 13 hours ago | Report Abuse
Haha I did said I queue buy Jaks lo …
3 days ago | Report Abuse
Haha konartist sslleee remember when you asked me whether average down on Jaks .. my replied is No but instead switch to Privasia :
3.) Privasia : cost below RM 0.10 … see my posts in Privasia on TA breakout Gap up to RM 0.14 .. cheers .
3 days ago | Report Abuse
Haha Repost :
2.) Jaks : catched the Bottom Fishing at RM 0.185 on April 2023 ( 👉 after Sslleee posted sold Jaks on April 2023 since 2017 ) ... Up to RM 0.225 in 2 months .. then invested at RM 0.19 on July 2023 .. Gap Up on 1/9/2023 to RM 0.245 …
As said earlier 2025 Shl be Jaks year .. since LSS5 Tender RFP dateline is brought forward to 25/7/2024 from December 2024 .. focus back to Jaks .
👉 Update : LSS5 2000 MW EPCC RM 7.2 billion Tender award Shl be starting announce on November 2024 .
3 days ago | Report Abuse
Haha Konartist sslleee own claimed TA n FA Guru ..can brief forumers here is Jtiasa waves 2 is coming ? same as you said in Yinson ( thinking waves 2 is Up but is Down ) .
From Stoch RSI chart ..previous 2 cycles upon reached 80 , Fast line shl divergent down cross below Slow line ..this round even did not reach 80 oredi divergent down but did not cross below Slow line …
So Konartist sslleee TA Gutu ..today Jtiasa Fast line shl be Divergent Up or further Divergent down cross below Slow line ?
Is previous 2 cycles for unloading process ???
3 days ago | Report Abuse
Haha what to do little adik tak boleh naik lagi …🤣🤣🤣
3 days ago | Report Abuse
Haha Repost :
Haha really laugh live me loh … why Konartist Sslleee posted here ( Insas ) ard 2 years ago So Fast U-Turn as he wanted to show off his monthly Luxurious lifestyle… he U-Turn in just exchanged a few posts …
recently on 2023 want to Show off his Luxurious entertainment again on his visit to China as Business Development Manager , just 1 Question to Sslleee , he oredi Diam Diam lo ..
3 days ago | Report Abuse
Haha konartist le r u taken wrong medicine ke … repeatedly lupa awak punya bola tak guna le , nak cari malu je pls don’t toxic yr working land …..🤣🤣🤣
3 days ago | Report Abuse
Haha on Jaks GGU :
Government guarantee (GGU)
* The GGU provides Vietnam Government Guarantee on all payment obligations of MOIT under the BOT contract and the EVN under the PPA.
* The guarantee on PPA is for 18 years from COD, and the full term of the BOT in the case of MOIT.
* Guarantor shall also pay interest on any sums outstanding.
* GGU also guarantee USD currency conversion and right to remit
* repayment of principal, interest, etc under financing document
* quarterly and annually profit distribution to JPP
* repayment of charter capital
* any expenses due to contracts goods imported
* any expenses due to foreign service contracts
* any payment that are due in foreign currency
3 days ago | Report Abuse
Haha Jaks :
Understand the Key Contractual Obligations of the project award
Investment certificate
* JHDP shall be entitled to 10% tax rate for the full term of the project.
* JHDP shall be exempted from corporate income tax for 4 years and 5% tax rate for another 9 years from 1st year with taxable income or 4th year whichever is earlier.
BOT contract
* 25 years from commercial operation date (COD).
* The power plant shall be transferred to Vietnam Ministry of Industry and Trade (MOIT) at no charge after 25 years.
* JHDP shall pay US$60,000 per day per unit for each day of delay after the deadline. The deadline for unit one shall be 48 months and 54 months for unit 2 after the construction start date. Subject to max of US$15m.
* JHDP shall pay US$150 per KW shortfall below the contacted capacity which is 1112MW subject to max of US$8m.
* JHDP company may terminate the BOT contract due to Vietnam side default or government events such as war, invasion, terrorist, revolution, strikes, none performance of GGU, change of laws.
* In the event of non-government force majeure like earth quake, flood etc, either party can terminate the BOT contract and MOIT has to purchase the assets based on the terms set out in the BOT contract. However, MOIT has the option to continue to pay the capacity charges and JHDP has no right to terminate.
3 days ago | Report Abuse
Haha konartist sslleee yr TinKosong KonpetHuang always said my Jaks Gearing Ratio is wrong .. what to do a Tin Kosong with a Half past Six Guru …
Referred to recently Yinson Group CFO financial reviews…
3 days ago | Report Abuse
Remember Do 3 Own : Own Homework, Own Analysis and Own DecisionS as only you know your Risk level and Holding power .
DecisionS: is changed Upon new information, new facts n figures.
3 days ago | Report Abuse
Jaks Annual Revenue and Net Profit / ( Loss ) :
1.) FYE2020 : RM 259.4 million with Loss ( RM 80.5 Million. )
2.) FYE2021 : RM 109.7 million with Net Profit RM 51.9 million. ( Vietnam Joint Venture Power Plant 1200 MW with EPCC RM 8.7 billion is COD on January 2021 )
3.) FYE 2022 : RM 89.8 million with Net Profit RM 53.5 million.
4.) FYE 2023 : 1st Half Revenue RM 17.47 million with Net Profit RM 33.19 million.
>>👉 1QR is Profit RM 14.08 million , 2QR is Profit RM 19.11 million , 3QR is Rm 7.15 million…4QR is Loss ( 24.8 million )
👉👉 Rm 37.787 million with Net Profit RM 15.527 million..
5.) FYE 2024 :
>> 👉1QR : RM 14.2 million with Net Profit RM 12.4 million.
>> 👉2QR : RM 13.1 million with Net Profit RM 8.4 million.
( Note : Vietnam Power Plant Joint venture company is 30 % .. an associate company)
3 days ago | Report Abuse
Haha the gimmick on how Jaks finance its 30 % share capital investment, RM 600 million:
1.) Cash RM 200 million
2.) Profit from EPC2 construction contract RM 400 million.
So far Profit from 30% associate Joint Venture Vietnam Power Plant 1200 MW company from October 2016 to June 2024 :
> 400 million + 597 million = RM 997 million.
3 days ago | Report Abuse
Jaks
1.) Vietnam Power Plant Share of Profit n Dividends :
2020 : RM 3.8 million ( 1 Power Plant is COD on Nov 2020 )
2021 : RM 140.7 million ( The 2nd Power Plant is COD on January 2021 ) .
2022 : RM 156.2 million , Dividend RM 70.0 million
2023 : 1QR = RM 28.326 M , 2QR = RM 32.312 M , 3QR = RM 35.862 M , 4QR = RM 34.503 M plus Dividend RM 27.386 M
2023 : RM 131 million , Dividend RM 27.385 million
Total Share of Profit = RM 431.703 Million
Total Dividend = RM 97.386 Million
Total = RM 529.089 Million
> Share of Profit in QR ended March 2024 =
RM 32.384 million
>> Total = RM 561.463 million
> Share of Profit in QR ended June 2024 = Rm 21.33 million
Dividend = RM 14.21 million
👉Grand Total = RM 597 million.👍
Jaks 30 % share in Vietnam Power Plant Joint Venture invested ard RM 600 Million.
( RM 400 million is from the Profit of Construction contract of the Vietnam Power Plant, EPC2.)
Initially PayBack 8 to 9 years ..
Referring to the Grand Total , PayBack period is by 2024 .. ie : from 2021 to 2024 ~~ 4 years ..
👉From Vietnam Power Plant 1200 MW EPCC RM 8.7 Billion started on October 2016 ,
Payback period is 8 years.
按照购电协议,电力售价将随原料价格波动。意味着业务盈利贡献获得保证。Jaks管理层曾透露内部回酬IRR介于12%,PAYBACK PERIOD为8至9年
3 days ago | Report Abuse
Haha Jaks got 2 Cash Cow Projects with Commercial Operating Date :
1) Vietnam Power Plant 1200 MW : January 2021 with BOT 25 years concession .
2) Local Solar LSS4 Project 50 MW in Penang : is COD on 21 August 2023 with 25 years TNB PPA ( increased from 21 years )
👉Looking forward to Solar CGPP 30 MW project which is scheduled COD by end 2025 ..
3 days ago | Report Abuse
Jaks 👉👉👉
2QR ended June 2023 :
> Accumulated Profit : 343,661,000. ( 1QR 324,951,000 ) ( Audited as on December 2022 is RM 310,874 ,000 )
>> Accumulated Profit on 3QR ended September 2023 : 350,327,000
👉 》〉Accumulated Profit on 4QR ended December 2023 : 348,126,000
👉 Accumulated Profit on 1QR ended March 2024 : 361,786,000
> Accumulated Profit :
March 2016 = 55,453,000 … > June 2024 = 369,116,000 .
3 days ago | Report Abuse
Jaks non current asset :
Investment in Joint Venture:
QR ended
> March 2016 = 128,297,000
> March 2019 = 197,171,000
> March 2020 = 362,479,000
> March 2021 = 601,150,000
( note : Profit from Construction of the Power Plant is ard RM 400 Million .. Final COD on January 2021 )
> March 2022 = 748,656,000
> March 2023 = 829,105,000
> September 2023 = 897,378,000
> December 2023 = 904,495,000
> March 2024 = 936,836,000
> June 2024 = 943 ,960,000
3 days ago | Report Abuse
Jaks Gearing ratio
>> Vietnam Power Plant is a Capital Intensive Project with Value USD 1.87 Billion ( RM 8.7 Billion) ..
Construction is started on 2016 , 2 unit Power Plant final COD on January 2021 :
Jaks Gearing Ratio :
See Jaks insiders had been monitoring n controlling the Gearing Ratio in a Healthy Level :
> FYE2015 : 0.80 X
1.) FYE2019 : 0.43 X
2.) FYE2020 : 0.34 X
3.) Referred to FY23 , 1 QR ended March 2023 : 0.375 X
4.) Referred to FY23 , 2QR ended June 2023 : 0.362 X
5.) Referred to FY23 , 3QR ended September 2023 : 0.352 X
6.) Referred to FY23 , 4QR ended December 2023 : 0.350 X
7.) 1QR ended March 2024 :
Gearing Ratio = 0.293X
8.) 2QR ended June 2024 :
Gearing Ratio = 0.303X
3 days ago | Report Abuse
Haha occupancy rate at Evolve Concept Mall saw an increase from 59% in FY2022 to 75% in FY2023.
Jaks Shl be in no hurry to monetise the 51% own Evolve Concept Mall …
3 days ago | Report Abuse
Jaks recently 9/9/2024 had monetised Property land in Penang with RM 77.74 million…Net Book Value as at Annual Report FYE2023 is RM 15.97 million…a net pro forma gain of RM50.38 million from the disposal.
3 days ago | Report Abuse
Haha following is to monetise Pacific Towers Business Hub after Jaks had Settlement Agreement with Star Media Group Berhad on 5/11/2024 :
b.) Pacific Towers : loan balance RM 70.6 million… net book value for Business Hub Tower only as at December 2023 is RM 232 million.
3 days ago | Report Abuse
Haha Jaks is started to monetise its assets :
1.) Referred to Annual Report FYE2023 , Jaks had acquired 30 plots of Free Hold lands in Seberang Prai , Penang on 2019 .
LSS4 50 MW project is awarded on 2021 ,Loans RM 220 million is approved on March 2022 .
I
> Jaks sold 13 plots of Penang lands , Balance 17 plots as LSS4 50MW Solar farm .
>> A smart n visionary of CEO Ang business acumen.
As compared to LSS5 2000 MW Solar project, EPCC RM 7.2 Billion ( tender RFP dateline 25/7/2024 ) … Jaks tendered for 200 MW ( with intention up to 500 MW ) , estimated EPCC RM 800 million ,
Land : 1730 acres in Terengganu is going to lease from TDM . ( up to 500 MW .. Rental is RM 578 per acre per year ) .
Based on type of Solar Panels ( different efficiency 12 % or 18 % ) selection , the Land can be a 200 MW to 500 MW Solar farm .
3 days ago | Report Abuse
Haha really laugh live me lo … Konartist ssllee little adik cannot naik … bola sudah tak guna ke !🤣🤣🤣🤔
3 days ago | Report Abuse
Haha Insas WB is Stockraider invested RM 5000 play wayang in WB forum with Calvin .
Konartist sslleee suddenly appeared in Netx on 2020 replied my Question to Stockraider on Insas WB .
Konartist sslleee told lies to bail out Stockraider on Insas WB .. then said Stockraider won 1 Myvi in Netx RI with Warrant .. Stockraider said won 2 Myvi … then both bla bla bla Klon the wayang script on Insas RI : PB n WC .. what a shameless liar ..
3 days ago | Report Abuse
Haha why Insas WC RM 250,000 is a Lie ?
>>> Konartist sslleee posted again on Insas WC win but wrote Insas WB , then twisted is typo error.. I asked him what is the Gain amount ? He twisted twisted but cannot replied on the amount !🤣🤣🤣
3 days ago | Report Abuse
Haha see Konartist sslleee is so jealous until told lie by lie on yr 1st n Only win on Insas WC RM 250,000 since investing from 2016 to 2023 … after :
1.) My case study in PA on 2021 .. 1 sen Up how many digits gain le !
2.) Capital A : catched the Lowest price as I said RM 0.56 … but my cost is 2 sen higher …Konartist sslleee after ard 2 years as Negative commentator in Capital A .. recently U Turn said Capital A is OK .
3.) Cutwin Zelan with MMC ( mother ) on 2021 during MMC privatisation .
Konartist sslleee told lies again that he thanks me on highlighted MMC in Insas which he Gain RM 180,000 !🤣🤔👍
3 days ago | Report Abuse
Haha as said my In ratio : 40 : 30 : 30 …n Out ratio ; 30 : 30 : 40
3 days ago | Report Abuse
Haha I did said I queue buy Jaks lo …
3 days ago | Report Abuse
Haha Konartist sslkeee still did not check what is my Jaks cost during you posted queue buy Insas WC at RM 0.25 in Insas forum .. today Insas WC price RM 0.155 … how many digits you Loss in Insas WC oredi !🤣🤔
—/
Posted by Sslee > 5 minutes ago | Report Abuse
The fact is while I'm looking at how many digits book gain with my jayatiasa and someone is licking his wounds looking at his how many digits book lose in jaks.
3 days ago | Report Abuse
Haha konartist sslleee why sold Jaks too early on April 2023 since 2017/18 …
Why ah Jaks hasn’t started the CGPP Solar farm EPCC construction ? No funding ke as Konartist sslleee always worried on this ? Even Solarvest oredi did PP funding for its CGPP EPCC RM 56 million but only raised RM 28 million.
Answer : 823 MW CGPP winners can choose their offtaker ( not only TNB ) .. either corporates companies customers with Data Center ( either cloud or AI DC ) and can export Cross Border to Singapore.
Singapore is in urgent to import 2000 MW RE due to YTLpower PowerSeraya 2 Plants going to be phased out due to service life in 2 to 5 years, total over 2000 MW .
TNB had firm budget RM 90 billion to upgrade its Power Grid structure n system over 6 years until 2030 as TPA ( Third Party Access ) .. more RE electricity is expected to be exported to Singapore.
TNB had announced the TPA mulling charges on 24/8/2024 … and CRESS is effective from end September 2024 .
3 days ago | Report Abuse
Haha konartist ssleee , why ah Jaks is with 51 % leading the Consortium… Sunview is in Solar RE EPCC le ..
As for Ann Joo group >>>
Ann Joo Green Energy Sdn Bhd (AJGE) was incorporated on 9 December 1976. It serves as a divisional holding company for investments in green technology and environmental enhancement initiatives.
* Ann Joo puts 100-acre prime Prai industrial land up for sale
STEEL manufacturer Ann Joo Resources Bhd (KL:ANNJOO) is seeking a buyer for its prime land in Seberang Perai, Penang. It is understood that the 100-acre plot is part of its 200-acre Prai industrial land. If the freehold tract sells as high as RM800 million or RM180 psf as estimated by industry ex...
11 Nov, 2024 15:00pm - Yesterday agoTheEdge
—-
👉 With reference to the above, the Company is pleased to enclose the press release in conjunction with the successful bid for a 29.99MW solar photovoltaic project under the Corporate Green Power Program by JAKS Solar Power Sdn Bhd, a wholly owned subsidiary of JAKS, together 👉👉👉with its consortium partners, Ann Joo Green Energy Sdn. Bhd. and Fabulous Sunview Sdn. Bhd.
This announcement is dated 9 August 2023.
4 days ago | Report Abuse
Haha oh he is with Big ego like to call forumers Kidd la … Despatch Boy la ( Stockraider, Konartist sslleee Abang in Netx n Insas wayang ) .
But he is a Kidd story teller in Promoting Serba without facts n figures even knew in Account Fraud !🤣🤣🤣🤔
4 days ago | Report Abuse
Haha this is interesting le to debate against the long tongue with redder eyes Kidd Story Teller Buy what u Not understand..🤣🤣🤣🤔
4 days ago | Report Abuse
Haha konartist sslleee why ah I debated against u … seems Ada pijak ekor the Kidd Story Teller Buy what u Not understand… now saya terus Terang pijak ekor dia .. diam diam Saja …🤣🤣🤣🤔
4 days ago | Report Abuse
Haha alamak Jtiasa today is red eye … Pchem is redder eye …
Kidd Story Teller Buy what u Not understand is with redder redder eyes ke …🤣🤣🤣🤔
4 days ago | Report Abuse
Pchem
Haha this is interesting… let’s see coming QR result ended September….an opportunity for Entry or CutWin ???
> QR ended June 2024 :
Exchange Rate :
USD / MYR
Average Rate 4.7323
Closing Rate. 4.7205
>> 30/9/2024 4.12557
USD /MYR is depreciated by 12.85 %
>>> As at 8/11/2024 4.38259
4 days ago | Report Abuse
Haha konartist sslleee is the Kidd story teller Buy what u Not understand yesterday got red eyes .. today redder eyes ke …🤣🤣🤣🤔
4 days ago | Report Abuse
Haha alamak Konartist sslleee how abt Pchem Plant , inefficient operations ke … price is dropped the Lowest over 10 years ..and P/B is Less than 1 … last week 0.95 .. today 0.90 .. inefficient ke going to …😱😱😱🤔
4 days ago | Report Abuse
Haha don’t play play with Konartist sslleee le … as posted in Pchem that a Vietnam new petrochemical Plant which invested USD 5.4 billion can be closed down after commercial launch for 2 weeks due to inefficient operations !
He is the GM of an Indonesia oleochemicals Plant …working alone at 64++++ kesian le ….
4 days ago | Report Abuse
Haha don’t play play with Konartist sslleee le … he had show off gone thru Accounting course le … 🤣🤔
—
Posted by Mikecyc > 25 minutes ago | Report Abuse
Haha the reply by Insider !
—-
Posted by Mikecyc > 2 hours ago | Report Abuse
Haha konartist sslleee own claimed TA n FA Guru in Yinson.. can brief forumers here the difference of MFRS and IFRS in its financial reporting… recalled only recalled only u had posted on the IFRS ? TQ ..
4 days ago | Report Abuse
Haha konartist sslleee need to ask again yr Kacukan Tippu gang ( Tippu newbies telegram membership fees RM 100 ) whether to press down 1 sen ke … as had record of asked them whether to push up 1 sen ….🤣🤣🤣😱🤔
Stock: [JTIASA]: JAYA TIASA HOLDINGS BHD
3 days ago | Report Abuse
Jtiasa CPO
An illustration :
Jtiasa CPO production output ( MT) X Monthly Average Price ( RM )
Sept2024 : 23,667 x 4023.5 = 95.22 million
Aug 2024 : 25,238 x 3910.5 = 98.69 million
July 2024 : 20,558 x 4034.0 = 82.93 million
> Total = RM 276.84 million
>> Note : Production Output compared Q to Q is increased by 31.91 % …. Illustration Revenue is increased by 31.21 % .
June 2024 : 17,018 x 3957.5 = 67.35 million
May 2024 : 16,419 x 3902.5 = 64.08 million
April 2024 : 13,857 x 4257.0 = 59.0 million
> Total = RM 190.43 million
👉QR June 2024 :
Revenue = RM 224.81 million
PBT = RM 31.07 million ( 13.82 % )
—