Followers
6
Following
1
Blog Posts
0
Threads
9,863
Blogs
Threads
Portfolio
Follower
Following
2022-07-13 09:35 | Report Abuse
Democracy your ass... Do you really know trump? Or who the republican will push for president? How you vote when you don't know the dude well.
2022-07-13 09:30 | Report Abuse
haiya.. cannot 1 la. ipo.. banker get burned last time they goreng ipo. that's why they no goreng anymore.
2022-07-13 09:18 | Report Abuse
oil price go down some more.. haha
2022-07-13 09:14 | Report Abuse
lucky i run already.
2022-07-12 14:00 | Report Abuse
PETALING JAYA: A highly-connected group of lobbyists used “every trick in the book” to secure a risk-free solar power contract 2.5 times over the limit for open bidding, according to former energy minister Yeo Bee Yin.
Yeo Bee Yin.
They represented independent power producers with “very high cables” who demanded a direct award for a 250-megawatt large-scale solar project, she writes in her memoir, The Unfinished Business.
“It irked me to have to put on a polite front with people who expected the government to hand them a cash cow instead of putting in an honest day’s work like everyone else,” she said.
Extracts of her book, which will soon be published, were made available to FMT.
-ADVERTISEMENT-
Ads by
In a chapter on power sector reforms, Yeo said the solar projects were part of the energy ministry’s plans to increase the share of renewable energy to 20% by 2025.
“We also set a policy that each company can only bid for 100MW in each round to make the bidding a stepping stone for more local players to grow,” she writes.
“This group demanded a direct award for a project 2.5 times larger than the maximum capacity set for open bidding.”
She said the group refused to be part of an arrangement where companies would build power plants at their own risk and bid to offer power supplies to the national grid at the lowest price at a particular time.
A chapter from Yeo Bee Yin’s memoirs The Unfinished Business.
“Of course, this group adamantly declined to do so. In short, this group wanted a risk-free solar IPP award. They tried every trick in the book to get me to give in, but I just could not bring myself to do it,” she writes in the book.
She said her rejection of the demand for direct contracts led to them painting an anti-business image of herself to their patron.
She said the lobbyist group turned down subsequent offers of other means to take part in the renewable energy plan.
Yeo said she tried to “rack her brains” to come up with polite ways to reject the lobbyists.
She noted that the effect of “big cable” lobbying was much less severe when Pakatan Harapan was in government compared to the Barisan Nasional and current Perikatan Nasional governments.
“Looking back now, I am glad that my team and I did our best to protect the people’s welfare from such suckers of blood,” she wrote.
2022-07-12 13:59 | Report Abuse
PETALING JAYA: A highly-connected group of lobbyists used “every trick in the book” to secure a risk-free solar power contract 2.5 times over the limit for open bidding, according to former energy minister Yeo Bee Yin.
Yeo Bee Yin.
They represented independent power producers with “very high cables” who demanded a direct award for a 250-megawatt large-scale solar project, she writes in her memoir, The Unfinished Business.
“It irked me to have to put on a polite front with people who expected the government to hand them a cash cow instead of putting in an honest day’s work like everyone else,” she said.
Extracts of her book, which will soon be published, were made available to FMT.
-ADVERTISEMENT-
Ads by
In a chapter on power sector reforms, Yeo said the solar projects were part of the energy ministry’s plans to increase the share of renewable energy to 20% by 2025.
“We also set a policy that each company can only bid for 100MW in each round to make the bidding a stepping stone for more local players to grow,” she writes.
“This group demanded a direct award for a project 2.5 times larger than the maximum capacity set for open bidding.”
She said the group refused to be part of an arrangement where companies would build power plants at their own risk and bid to offer power supplies to the national grid at the lowest price at a particular time.
A chapter from Yeo Bee Yin’s memoirs The Unfinished Business.
“Of course, this group adamantly declined to do so. In short, this group wanted a risk-free solar IPP award. They tried every trick in the book to get me to give in, but I just could not bring myself to do it,” she writes in the book.
She said her rejection of the demand for direct contracts led to them painting an anti-business image of herself to their patron.
She said the lobbyist group turned down subsequent offers of other means to take part in the renewable energy plan.
Yeo said she tried to “rack her brains” to come up with polite ways to reject the lobbyists.
She noted that the effect of “big cable” lobbying was much less severe when Pakatan Harapan was in government compared to the Barisan Nasional and current Perikatan Nasional governments.
“Looking back now, I am glad that my team and I did our best to protect the people’s welfare from such suckers of blood,” she wrote.
2022-07-07 16:02 | Report Abuse
time for glove to drop another 40%
2022-07-07 15:07 | Report Abuse
sharkie, dont main buy queue.. dont be a kid.
2022-07-07 15:06 | Report Abuse
cpo drop kaw kaw
https://mpoc.org.my/daily-palm-oil-price/
2022-07-07 15:05 | Report Abuse
主要业务表现仍疲软,沙布拉能源首季核心亏损为2.03亿令吉,符合预期,我们和市场对该公司的全年净亏预测,分别为7.58亿令吉和5.801亿令吉。
截至4月底,该公司手持订单达83亿令吉,而正在竞标项目高达230亿令吉。
该公司首季的财务状况继续恶化,从去年末季的99亿令吉负债,激增至102亿令吉。
陷入PN17的公司将难以获得新资金,使现金流周转不灵,而无法赢得新订单。
另外,该公司近年来未展示出令人满意的业绩,反而是有工作交付和执行风险增加,以及项目成本超支加剧的迹象。
因此,我们认为中短期内要转亏为盈将是一项艰巨任务,该公司需更努力才能重返正轨。
综合以上,我们维持净亏预测、“卖出”评级,及1仙目标价。
2022-07-07 14:59 | Report Abuse
0.045 queue longer than 0.04. i think.
2022-07-07 14:52 | Report Abuse
nice. add buy queue. sharkie.
2022-07-07 14:50 | Report Abuse
buy queue don't pull leh.. sharkie
2022-07-07 14:19 | Report Abuse
yeah you want to lose money until jadi pn17.. very susah.. u see those goreng stock. every quarter lose money still no pn17.
2022-07-07 14:15 | Report Abuse
the fall of heng yuan.
2022-07-07 14:14 | Report Abuse
ppl already looking at third and fourth quarter result.. you still thinking second quarter?
2022-07-07 14:13 | Report Abuse
future = cpo price drop kaw kaw.
2022-07-06 17:45 | Report Abuse
pre-covid the opr is 3%.. lol.. now 2.25% is kira low already.
2022-07-06 15:19 | Report Abuse
we might just that lucky to narrowly escape recession.
2022-07-06 15:18 | Report Abuse
europe is bullish.. airbus just got big deal from china. china won't be giving big order if they foresee economy downturn.
2022-07-06 15:16 | Report Abuse
nice movement.. confirm green tomorrow.
2022-07-06 15:15 | Report Abuse
not production more and cause the price drop.
2022-07-06 15:15 | Report Abuse
but oil drop is because ppl afraid of recession.
2022-07-06 12:43 | Report Abuse
guard their own currency maybe. America first.
2022-07-06 12:23 | Report Abuse
lol. whats war monger? taiwan belong to china.
2022-07-06 09:21 | Report Abuse
biden will meet xi to take away the tariff soon..
https://www.aljazeera.com/economy/2022/7/5/us-china-talk-trade-supply-chains-as-biden-weighs-tariff-cuts
2022-07-06 09:18 | Report Abuse
don't care mabel. most likely she lies 1.
2022-07-05 08:39 | Report Abuse
those talk kuat kuat 1.. sendiri maybe already run.. haha
2022-07-04 16:37 | Report Abuse
topglove is 100% for you.
2022-07-04 16:36 | Report Abuse
haih.. topglove is only 0.05% for epf. burnt then burnt
2022-07-04 16:28 | Report Abuse
let ular spam. later drop until 0.9 he will missing.
2022-07-04 15:37 | Report Abuse
i will buy if drop to rm0.50.
2022-07-04 15:35 | Report Abuse
if mpi back to rm10. this must be back to rm0.50
2022-07-04 10:14 | Report Abuse
you see market you know. a lot of money gone missing.. all ready for bad thing to happen..
2022-07-04 09:14 | Report Abuse
orang sudah burning. u cakap macam tu.. mabel.. u are not human.
Stock: [INARI]: INARI AMERTRON BERHAD
2022-07-13 11:33 | Report Abuse
change owner?