KUALA LUMPUR (Feb 20): Oil and gas offshore marine service provider Perdana Petroleum Bhd has bagged a RM7.96 million contract from Petronas Carigali Sdn Bhd to supply one unit of anchor handling tug and supply (AHTS) vessel. In a filing with Bursa Malaysia on Monday (Feb 20), Perdana Petroleum said its wholly owned subsidiary Perdana Nautika Sdn Bhd has received a work order award from Petronas Carigali on Jan 27. Under the deal, Perdana Nautika will provide the AHTS vessel with crews and equipment. "The contract, which will commence on the vessel's on-hire certificate date, estimated on March 1 is for a duration of up to 245 days, with an option to extend for up to 30 days," it added.
"The contract is expected to contribute positively to the group's earnings and net assets for the financial year ending Dec 31, 2023." Perdana Petroleum shares closed unchanged at 18 sen on Monday, giving it a market capitalisation of RM399.44 million.
https://www.borsig.de/en/fokusthemen/energie https://www.igb.fraunhofer.de/en/reference-projects/megalyseurplus.html MegaLyseurPlus research project:- Project partners:- Fraunhofer Institute for Microstructure of Materials and Systems IMWS (Coordinator) Fraunhofer Center for Chemical-Biotechnological Processes CBP FUMATECH BWT GmbH Infineon Technologies AG Infineon Technologies Bipolar GmbH & Co. KG Siemens AG BORSIG ZM Compression GmbH Hannweber Engineering GmbH
- MegaLyseurPlus research project. - Getting the energy transition into the tanks. Hydrogen is set to play a pivotal role in the energy mix of the future. With the development of a new, oilfree compressor, BORSIG is helping to create the required infrastructure.
The transition to a green hydrogen industry is currently being driven forward at full speed, but before hydrogen can be used on the desired scale, a number of technical challenges still need to be resolved. These issues are the key focus of the MegaLyseurPlus joint research project, in which BORSIG is involved.
The aim of the project is to optimise the individual components of an electrolysis plant in order to make them fit for economic use in large-scale plants generating several megawatts of power. One of the focal points of MegaLyseurPlus is to develop an oil-free compressor for hydrogen. It serves as an interface to end applications, such as the refuelling of fleet vehicles, and to protect the new, eco-friendly propulsion systems, such as fuel cells.
The advantages of the oil-free piston compressor over the current alternatives are quite considerable. The new piston compressor has a slightly higher output than a membrane compressor and a maintenance requirement that is easy to plan.
The standardisation of components was also part of the project, which promises further savings potential during regular operation going forward. A prototype of the compressor is still undergoing a final series of measurements until the end of 2022. After that, nothing will stand in the way of its deployment in the transformation to a green hydrogen economy.
Sell Borsig lar, sell ethanol plant, sell renewable energy UK plant, sell office building, sell office furnitures, appliances and office glass doors, every thing can sell just sell to raise cash to pay off debts. Otherwise will end up like SerbaDynamite and the two can sing song ...Oh happy together.
AI reply : KNM Berhad is a Malaysia-based company that operates in the engineering, procurement, construction, and commissioning (EPCC) industry. The company provides custom-made process equipment, modular systems, and engineering solutions for various industries, including oil and gas, petrochemicals, renewable energy, and environmental sectors.
As of September 2021, KNM Berhad's financial highlights include:
Revenue: RM 2.05 billion (approx. USD 490 million) Net loss: RM 73.9 million (approx. USD 17.6 million) Total assets: RM 2.6 billion (approx. USD 620 million) Total liabilities: RM 1.5 billion (approx. USD 357 million) It's worth noting that these figures are subject to change based on the company's financial performance and market conditions.
#KNM Bursa news On behalf of the Board, M&A Securities is pleased to announce that the Company has on 11 April 2023 fixed the issue price of the first tranche of the Placement Shares at RM0.0500 per Placement Share to be issued pursuant to the Private Placement (“Price-Fixing Date”).
The aforementioned issue price of RM0.0500 per Placement Share represents a discount of approximately RM0.0009 or 1.77% from the 5D-VWAMP of KNM Shares from 4 April 2023 to 10 April 2023, being the market day immediately preceding to the Price-Fixing Date of approximately RM0.0509 per KNM Share.
#Bursa News Additional Listing Announcement /Subdivision of Shares No. of shares issued under this corporate proposal 37,500,000 Issue price per share ($$) Malaysian Ringgit (MYR) 0.0500 Listing Date 20 Apr 2023 Part of Private Placement of up to 10% of the issued shares in KNM
04/2023 #Borsig news BORSIG technology for Project ONE of INEOS in Antwerp (Belgium)
Project ONE is the largest investment in the European chemicals sector in a generation. The new cracker in Antwerp will have the lowest carbon footprint of any European cracker, five times better than the worst in Europe and twice better than the best. The plant is designed to use low-carbon hydrogen. Once enough is available, the cracker will have a zero carbon footprint. BORSIG Process Heat Exchanger GmbH will supply 78 linear cooler modules for the project's ethylene furnaces.
04/2023 #Borsig news Successful exchange of a vapour recovery membrane for Orlen in Ostrow (Poland) BORSIG Membrane Technology GmbH A defective 2000 m³ membrane within a vapor storage tank had to be replaced. The membrane serves as a buffer for gasoline vapors of a downstream VRU (vapor recovery unit). Together with our partner in the field of tank services, the work was excellently planned.
In a first step, the old, defective membrane was dismantled and then all necessary preparations were made for the installation of the new membrane.
In the following step, the new membrane (a weight of 1.2kg/m²) including suspension and all corresponding accessories was installed. After a successful leak test and function test, the vapour holder could be put back into operation.
Due to the smooth cooperation of all trades, the agreed time schedule was adhered to and the project was implemented to the full satisfaction of the customer.
March 27, 2023 #offshore-energy Denmark and Germany ally on hydrogen and energy systems integration
Denmark and Germany have signed a cooperation agreement on green hydrogen and the integration of the two countries’ energy systems.
According to Denmark’s Ministry of Climate, Energy, and Supply, the declaration is to facilitate an ongoing dialogue between Denmark and Germany and relevant actors about hydrogen infrastructure.
The main focus is on paving the way for green hydrogen to be transported from Western Denmark to Northern Germany in a land-based hydrogen pipeline across the border between the two countries from 2028.
03/2023 # linkedin BORSIG GmbH BORSIG ZM Compression GmbH is pleased to announce a new order from a European customer for the design and supply of two integrally geared turbo compressor units for the compression of wet carbon dioxide. #integrallygeared #compressor #turbocompressor #borsigzm #carbondioxide #API617 #carboncapture #CO2removal #BORSIG
05/2023 #Borsig news Laying of the foundation stone in Gladbeck for new office building in Gladbeck (NRW), Germany
On May 02, 2023 the foundation stone was laid for the 1400 sqm new office building at our site in Gladbeck (NRW). The new administration building will only be the first step, further building areas have been included in the approval process, so that a planned expansion of the production can be carried out in the next step.
The building will be equipped with sustainable energy technology, photovoltaics, heat pumps and e-charging columns are planned.
05/2023 #Borsig news Superbloc® shut-off ball valve on its way to Bintulu, Malaysia In April 2023, the largest valve ever built by BORSIG ValveTech successfully left the Berlin plant for Malaysia. There, the 33-ton Superbloc® shut-off ball valve will be used in an LNG plant.
This book is the result of the author's many years of experience and observation throughout his 26 years in the stockbroking industry. It was written for general public to learn to invest based on facts and not on fantasies or hearsay....
success2628
377 posts
Posted by success2628 > 2023-02-11 08:17 |
Post removed.Why?