KLSE (MYR): ARMADA (5210)
You're accessing 15 mins delay data. Turn on live stream now to enjoy real-time data!
Last Price
0.535
Today's Change
-0.005 (0.93%)
Day's Change
0.535 - 0.545
Trading Volume
12,490,700
2024-11-19
2024-11-18
2024-11-18
2024-11-16
2024-11-15
2024-11-15
2024-11-15
2024-11-15
2024-11-15
2024-11-14
2024-11-14
2024-11-14
2024-11-14
2024-11-14
2024-11-11
Robert Waters
760 posts
Posted by Robert Waters > 2023-06-08 10:42 | Report Abuse
LM, short info,
Shut in means that the wells are closed.
Shut down means that the toposide FPSO systems are not in operation.
During shut ins all the topside systems can still operate in some minimum mode by recirculating the hydrocarbons. That way, re - introducing hydrocarbons is easy.
Hot start up is when you restart equipment right after the trip, with all systems still under pressure and temperature. Cold start up is from scratch, usually after maintenance. Those terms are NO LONGER used as cold LNG complicates things.
There are 2 possible scenarios now:
1. They may have isolated one train, still operating in recirculation on train B for quick re-start after trip.
2. They did full plant wide shutdown for the ease of maintenance. Then you can do group isolation and service all equipment without worry about hydrocarbons kit by kit. So they could do a lot of maintenance during full shut down However, for that you may need full specialized crew of dozens of people and a lot of planning is required.
Hope not too much info.