9MFY17 Results below expectations. 9MFY17 earnings came in below expectations. VIHB’s 9MFY17 earnings of RM5.2m (-72%YoY) came below with our estimates. Its net profit accounted for 5.2% of our full-year forecasts respectively. The stark deviation was due to lower revenue recognition from projects due to progress billings and delays in certification of construction progress.
Earnings estimates varied to reflect slower pace of construction billings. We make slight variations to our assumption as we believe that FYE18 could be a better year for VIHB to recognize its billings for is orderbook level but the progress will be slower. Thus, we trim our earnings forecast for FYE17 by -25.0% from RM99.9m to RM79.9m to reflect a slower billings recognition. This has resulted into a -30.0% reduction from the indicative value stemming from construction segment from RM806.5m to RM620.6m resulting into -22.8% of its per share value from 0.249 sen to 0.192 sen.
Continue to bid for strategically located projects. That why, we are expecting that VIHB will continue to continue to bid for affordable housing and infrastructure projects in Perak, Terengganu and Klang Valley. We have reasoned before in our previous note that the VIHB’s margin is facing stiff pressure from higher mobilization costs. The projects then would be strategic as it would be connected to mixed development with lower mobilization cost hence maintaining its current margin level.
Recommendation. We reaffirm our BUY recommendation with an TP of RM0.33 per share based on discounted cash flow (DCF) with WACC of 7.4% and an enlarged share base.
Source: MIDF Research - 4 Dec 2017
Chart | Stock Name | Last | Change | Volume |
---|
Created by sectoranalyst | Nov 22, 2024
Created by sectoranalyst | Nov 22, 2024
Created by sectoranalyst | Nov 22, 2024
Created by sectoranalyst | Nov 21, 2024
Created by sectoranalyst | Nov 21, 2024
prince4
国家要减赤字,几亿几十亿小工程(MRT,LRT) 有赚钱有需求,都有动工都有做都有走。
百亿大型工程(HSR,East Coast Railway Link,Gemas JB double track )
不会走的 ! 人民不是很需要用到因为高铁票很昂贵,这项目国家没有赚钱的还要补贴钱给你们用这一辆三年都不会走的 ! GE14 前 纳吉还没有confirm赢全部大型工程更不会做),不管是大型建设或大型房地产项目尤其跟1Mdb 的 (TRX,bandar malaysia),纳吉做首相已经8年多了没有任何一个大型工程和项目开工完全没有做!
1.纳吉赢了估计也是在2020年前也不会做的(国家要减赤字)
纳吉做首相到今天budget 每年差不多这样(行政开支两千两百亿左右,发展开支4百多亿)没有而外钱做的!
2.纳吉输了,希望联盟赢了会停止所有不因该做的项目,所有建筑和地产以前依赖走后门拿到有价钱政府工程的建筑股和地产股肯定会跌(工程公开招标)
希望联盟赢了预料会减低通膨,废掉GST,整顿国家财政给马币升值(都是以民为本的治国是未了铺路GE15 继续蝉联)
2018-01-04 12:09