hng33

hng33 | Joined since 2013-01-11

Investing Experience -
Risk Profile -

Followers

77

Following

5

Blog Posts

0

Threads

20,446

Blogs

Threads

Portfolio

Follower

Following

Summary
Total comments
20,446
Past 30 days
25
Past 7 days
14
Today
0

User Comments
Stock

2024-04-27 15:14 | Report Abuse

Under the new rates, the first 20 cubic meters is at 62 sen (up 182 per cent from 22 sen), from 20 cubic metres to 35 cubic metres the rate is at RM1.17 (up 154 per cent from 46 sen) and for the third band of more than 35 cubic metres, the rate is RM2.07 (up 204 per cent from 68 sen).



Stock

2024-04-27 15:10 | Report Abuse

Penang water bill show PBA will reap minimum additional RM 10 hike for those minimum water usage and much more higher for those use more water.

Stock

2024-04-27 15:09 | Report Abuse

Penang consumer’s water bill, which he said used to be RM7.70 at every bill cycle has now gone up to RM17.36 under the new rates with the same water usage

For a household that used to pay around RM47 every bi-monthly, the bill went up to RM126 under the new rates for around the same water usage

Stock

2024-04-26 11:04 | Report Abuse

bought back myeg at 86.5sen

Stock

2024-04-25 14:41 | Report Abuse

second casino is coming + HSR +special economic zone

Stock

2024-04-25 11:19 | Report Abuse

bought ekovest at 45sen

Stock

2024-04-22 15:53 | Report Abuse

added more a t 1.02-1.03

Stock

2024-04-22 15:52 | Report Abuse

cut at 1.02, swap to UEMS

Stock

2024-04-19 16:22 | Report Abuse

Cost reduce from RM 110 bil to RM 70bil will boots up commercial viability of these mega project.

https://www.nst.com.my/business/corporate/2024/04/1039838/rm70bil-high-speed-bullet-train-project-bttv

Stock

2024-04-19 15:44 | Report Abuse

be patient, HSR is coming soon

Stock

2024-04-19 15:42 | Report Abuse

The Kuala Lumpur-Singapore high-speed rail (KL-SG HSR) project might tally up to about RM70 billion, a notable decrease of around 30 to 35 percent from the previously reported RM110 billion, according to market insiders

https://www.nst.com.my/business/corporate/2024/04/1039838/rm70bil-high-speed-bullet-train-project-bttv

Stock

2024-04-19 15:01 | Report Abuse

The Kuala Lumpur-Singapore high-speed rail (KL-SG HSR) project might tally up to about RM70 billion, a notable decrease of around 30 to 35 percent from the previously reported RM110 billion, according to market insiders

https://www.nst.com.my/business/corporate/2024/04/1039838/rm70bil-high-speed-bullet-train-project-bttv

Stock

2024-04-19 13:47 | Report Abuse

Added more at 99sen

Stock
Stock

2024-04-18 16:30 | Report Abuse

bought iwcity at 74sen

Stock

2024-04-17 16:28 | Report Abuse

bought UEMS at 1.04

Stock
Stock

2024-04-16 15:58 | Report Abuse

bought LBS at 67sen. Expect at least dividend 2.8sen to be announced soon

Stock

2024-04-03 16:45 | Report Abuse

With water traffic hike, concession water have become lucrative business model.

Stock

2024-04-02 15:40 | Report Abuse

cut balance at 79sen

Stock

2024-04-02 14:53 | Report Abuse

cut at 78.5sen

Stock

2024-04-02 14:43 | Report Abuse

added more ranhill at 1.04-1.05

Stock

2024-03-27 17:00 | Report Abuse

bought PBA at 1.81

Stock

2024-03-27 16:33 | Report Abuse

bought ranhill at 1.08-1.09

Stock

2024-03-26 19:18 | Report Abuse

Resume share buyback. Myeg strong cash flow and ownership RM300m zetrix token (digital asset) at super high paper gain should be able to mop up 10% stake in myeg

Stock

2024-03-26 17:29 | Report Abuse

https://www.yinson.com/highlights/YP-FPSO-Atlanta-sets-sail-Brazil/

Yinson Production’s FPSO Atlanta sets sail to Brazil

Posted Date: 21 Mar, 2024

Yinson Production’s FPSO Atlanta set sail to Brazil today, marking the successful completion of the project execution phase, and is expected to arrive in the Atlanta field in the Santos Basin offshore Brazil during the second quarter 2024. The sail away follows the grand naming ceremony that was held for the FPSO in December 2023.

FPSO Atlanta is a redevelopment project awarded to Yinson Production by Enauta Energia S.A. (“Enauta”) on 21 February 2022 as an EPCI (“Engineering, Procurement, Construction, Installation”) Project. In July 2023, Yinson Production exercised its option to purchase FPSO Atlanta, which includes a 15-year firm plus a 5-year option contract for the supply and operations & maintenance with a total contract value of up to USD 1,981 million. FPSO Atlanta has a production capacity of 50,000 barrels of oil per day and a maximum storage capacity of 1,200,000 barrels. The FPSO features an efficient carbon management process plant, which utilises fuel gas for cargo tank inertisation that will significantly reduce flare gas emissions through a closed flare system. The plant is part of Enauta and Yinson Production’s continuous efforts in reducing carbon emissions and being the frontrunner in decarbonising the FPSO industry towards the goal of net zero.The project, carried out at Drydocks World Dubai, was completed safely with over 9 million man-hours without lost time incident. The safety performance is an excellent achievement for the project, demonstrating the highest level of safety standards by the project team.

Scott Bendiksen, FPSO Atlanta Project Manager said, “With over 9 million-man hours worked without a lost time incident, safety has remained our top priority throughout every phase of the project. We look forward to seeing FPSO Atlanta contribute to Enauta’s operations in the Santos Basin, further solidifying our position as a trusted partner in the offshore energy sector.”

Vinicíus Passos, Enauta’s Executive Deployment Manager said, “This is one more milestone achieved, which marks the successful conclusion of FPSO Atlanta's adaptation phase, with the aim of delivering the project on time and within budget. More than 2 years without any incident demonstrates the highest level of safety standards by the team that worked on adapting the vessel.”

FPSO Atlanta is the second of three FPSOs Yinson Production is delivering to clients in Brazil. The first vessel, FPSO Anna Nery, is already operational after achieving first oil in May 2023, while the third FPSO is currently under being built in China and progressing well towards completion this year.

Stock

2024-03-26 16:59 | Report Abuse

bought yinson at 2.35

Stock

2024-03-21 20:19 | Report Abuse

Sslee

Additional Cash inflow from share disposal RM 60-66m on top of recurring Q profit will further boots up INSAS cash hoard to above RM 1.2 billion in next Q. These is almost cash RM 1.80/share......

Stock

2024-03-21 18:38 | Report Abuse

Finally, EPF ease to be substantial shareholder of myeg. Next is KWP. These will gradually eliminate manipulation pressure by these 2 pension fund in future.

Stock

2024-03-21 17:38 | Report Abuse

Sslee
What is insas expected gain of disposal from inari and M&A? What is insas cost holding in its book value

Stock

2024-03-18 10:35 | Report Abuse

sold for contra at 79sen

Stock

2024-03-15 15:39 | Report Abuse

bought iwcity at 76.5-77sen

Stock

2024-03-15 12:29 | Report Abuse

As major shareholder, myeg will get most of the Heitech subcontract gov work later

Stock

2024-03-15 12:25 | Report Abuse

DATUK WIRA FARHASH WAFA SALVADOR (former Perak PKR chairman, acquire 15.9% heitech)+ MR WONG THEAN SOON (myeg, acquire 15.9% heitech), jointly now control 31.8% Heitech ----> NIIS

Stock

2024-03-11 10:03 | Report Abuse

Myeg bought 14.4% stake in heitech become the largest shareholder now - jointly bid NIISE

Stock

2024-03-05 14:30 | Report Abuse

MYEG e-testing driving licence is coming

Stock

2024-03-04 18:26 | Report Abuse

implementation of the pilot phase for MYDTS (“MYDTS Pilot Test”) involving actual test candidates from 18 December 2023 until 16 February 2024.

Now entering Mar, MYEG just need await to be awarded concession which is long overdue delay due to previous covid time.

Stock

2024-03-01 11:44 | Report Abuse

One link will let know well how DEEP value myeg have embedded

Myeg, Zetrix coin performance, current unit in circulation, and total outstanding unit available for sale in future and HUGE market current market capitalization and FULLY value market capitalization, all in MULTI BILLION USD PROFIT on track to monetize by myeg on staggering basis
https://coinmarketcap.com/currencies/zetrix/

Stock

2024-02-29 11:36 | Report Abuse

cut first at 39.5sen

Stock

2024-02-29 11:35 | Report Abuse

cut first at 2.02-2.04

Stock

2024-02-29 11:16 | Report Abuse

cut at 63.5sen first

Stock

2024-02-28 14:57 | Report Abuse

sold back all at 66-67sen

Stock
Stock

2024-02-28 09:45 | Report Abuse

sold all UEMS at 1.07, swap to Myeg

Stock

2024-02-28 09:41 | Report Abuse

selloff overdone, LHI disappointed result spread to Teoseng, but its indeed overdone. Both still reap profit, raw material cost still trending down and Teoseng and LHI financial keep improving and more dividend is coming. Just hold and wait for next dividend

Stock

2024-02-28 09:28 | Report Abuse

selloff overdone, LHI still reap profit, raw material cost still trending down and LHI financial keep improving and more dividend is coming. Just hold and wait for next dividend

Stock

2024-02-26 23:09 | Report Abuse

Egg-cellent

Stock