BENALEC HOLDINGS BERHAD

KLSE (MYR): BENALEC (5190)

You're accessing 15 mins delay data. Turn on live stream now to enjoy real-time data!

Last Price

0.11

Today's Change

0.00 (0.00%)

Day's Change

0.11 - 0.115

Trading Volume

31,600


46 people like this.

13,786 comment(s). Last comment by Karlos 1 month ago

Posted by Whiteevoque > 2024-01-06 19:29 | Report Abuse

Another counter that BO from downtrend line. Collect below 14 before it moves above 20c. My swing target 30-40sen

laucsh

82 posts

Posted by laucsh > 2024-01-07 14:55 | Report Abuse

lai liao....land very laku in johor and melaka....flying to the sky

adikkici

888 posts

Posted by adikkici > 2024-01-08 09:37 | Report Abuse

Boring

scott88

413 posts

Posted by scott88 > 2024-01-08 10:47 | Report Abuse

Jangan risau
Company ini anak sultan johor Tunku Ismail Ibni Sultan Ibrahim ada share 21%
akan naik juga

manbp2000

56 posts

Posted by manbp2000 > 2024-01-11 16:19 | Report Abuse

tengah kutip

koyokui

1,964 posts

Posted by koyokui > 2024-01-11 19:42 | Report Abuse

Buy johor related stock

Posted by Whiteevoque > 2024-01-11 20:19 | Report Abuse

Soon rocket to 20. This company has so many lands in johor and klang valley. Anytime will reflect the fair price

manbp2000

56 posts

Posted by manbp2000 > 2024-01-17 15:02 | Report Abuse

what happen

ocbc

1,170 posts

Posted by ocbc > 2024-01-26 16:39 | Report Abuse

akan datang

Posted by mayongzheng > 2024-01-26 17:53 | Report Abuse


ISKANDAR PUTERI, Nov 28 — The Johor state government is expecting RM60 billion in additional investments covering various projects at the Pengerang Integrated Petroleum Complex (PIPC) in Pengerang, Kota Tinggi, involving the third phase of the development.

State Investment, Trade and Consumer Affairs Committee chairman Lee Ting Han said that the third phase of the PIPC development will cover the years 2026 to 2031, in line with the PIPC Master Plan.

He said seven various projects in the pipeline are expected to be realised during the development of the third phase of PIPC, including the construction of solar farms, bio-refineries and facilities producing nitrile-related products.

“These projects are still at the feasibility study stage. It is still early. Those projects are likely (to be realised) in the 2026 to 2031 phase because, like chemical and petrochemical projects, they involve massive capital expenditure.

“Once they (investors) decide to invest, they will be there for the long term. Therefore, the typical feasibility study would take two to three years or maybe more. So, these companies have been very cautious,” he told reporters on the sidelines of the Johor state assembly here today.

Lee added that the PIPC, which is currently in the middle of the second phase (2020-2025), has received a committed investment of almost RM140 billion, which is 90 per cent of the target set in the master plan.

“A total of 7,400 job opportunities have been created in the Pengerang area during the middle phase and for the third phase, we hope to add another 10,000 job opportunities,” he said.
Earlier, Lee (BN-Paloh), when replying to an oral question from Aznan Tamin (BN-Tanjung Surat), said that in Budget 2024, which was approved by the Dewan Rakyat yesterday, the federal government announced that the development of the PIPC will continue to be supported through the provision of special tax incentives or investment tax allowances.

He said the initiatives are in line with the New Industrial Master Plan (NIMP) 2030 and Chemical Industry Roadmap 2030, in which the chemical and petrochemical sector is one of the prioritised industries.

Aznan had asked what the government’s incentives were to ensure that the Pengerang area remains strategic and becomes the main choice of foreign investors.

Through Budget 2024, the federal government announced that the PIPC, which is a 9,269-hectare downstream oil and gas and petrochemical industry area in Pengerang, will be made a hub to further develop the chemical and petrochemical industry. — Bernama

Posted by mayongzheng > 2024-01-26 17:55 | Report Abuse

柔佛州一部分相关的股已经被热起来,除了BENALEC 未热·
本人看中BENALEC。

ocbc

1,170 posts

Posted by ocbc > 2024-01-26 20:07 | Report Abuse

collect cepat cepat..... another 300% coming.

Posted by stockintalk > 2024-01-30 19:39 | Report Abuse

Royal-linked Maharani Energy Gateway secures RM9.5b renewable energy investment from China firm!!

KUALA LUMPUR (Jan 29): Johor royalty-linked Maharani Energy Gateway Sdn Bhd (MEG) has secured a US$2 billion (RM9.47 billion) investment commitment from China Energy International Group Sdn Bhd (CEIG) for a renewable energy project located in the Maharani Energy Gateway Free Trade Zone (MEG FTZ) in Muar, Johor.

The proposed project saw two collaborative framework agreements inked between MEG and CEIG on Monday to build a combined cycle gas turbine (CCGT) power plant and a green hydrogen and green ammonia plant.

CEIG is the Malaysian subsidiary of China Energy Engineering Corp.

“One of the key components of the project is a joint venture between MEG and CEIG to build a green hydrogen plant and a CCGT power plant in the MEG FTZ,” said MEG executive chairman Datuk Dr Daing A Malek at the signing ceremony.

According to CEIG vice president of Southeast Asia regional headquarters Fan Yi, the CCGT plant is to have a peak generation capacity of 1.4GW, while the green hydrogen and green ammonia plant are to produce 3,400 metric tonnes (MT) of hydrogen and 18,800 MT of ammonia per year.

“We start construction after financing closure and first of all we have to negotiate, assisted by MEG, to talk about the off-takers such as TNB and we also get gas supply from Petronas,” Fan said.

“The first priority is we’re going to sign a PPA (power purchase agreement) with MEG, and MEG will supply power to all tenants in the FTZ,” she added.

The MEG project is a sea reclamation project off the coast of Muar which aims to create an energy hub and deep-sea port with three man-made islands covering an area of 1,295 hectares square.

A check with the Companies Commission Malaysia showed that MEG is 45% owned by K Energy Sdn Bhd, followed by the Sultan of Johor and soon-to-be Yang di-Pertuan Agong Sultan Ibrahim ibni Almarhum Sultan Iskandar, with a 40% stake, while Daing holds the remaining 15%.

K Energy is equally owned by Eric Ong Zong Ren and Valerie Ong Huei Zhen.

Minister of Investment, Trade and Industry Tengku Datuk Seri Zafrul Abdul Aziz, who was present to witness the signing ceremony, said government policies such as the New Industrial Master Plan 2030 and the New Energy Transition Roadmap have resulted in collaborations between foreign parties and domestic players.

“To that end, I welcome the MEG project, which is strategically positioned right in the centre of the East-West trade route. It is only five sailing days away from China, an important market for oil and gas, and also 28 sailing days to the Middle East, and 38 days to the Black Sea,” he said during a speech at the signing ceremony.

Zafrul also said that the MEG project would be a compelling proposition as a renewable energy-focused regional hub, as it is accessible to major cities such as Kuala Lumpur and Johor Bahru and benefits from its proximity to vast lands and water bodies.

Posted by Calvinharris > 2024-01-31 07:39 | Report Abuse

Benalec mempunyai banyak tanah di Johor, kira sebuah kaunter yg bakal melonjak-lonjak tambahan pula menerima manfaat yg tidak langsung daripada HSR. Makin banyak tanah perlu dibangunkan di Johor

SuperPanda

11,431 posts

Posted by SuperPanda > 2024-01-31 17:40 | Report Abuse

buy and keep, potential for big goreng this year

Posted by Calvinharris > 2024-01-31 22:08 | Report Abuse

https://m.malaysiastock.biz/Company-Announcement.aspx?id=1537116

Dato' Leaw Seng Hai , The CEO ACQUIRED Benalec!

willc48

722 posts

Posted by willc48 > 2024-02-01 01:35 | Report Abuse

i am surprise? No. Drive down price & buy back shares ar cheap price.,

Karlos

1,284 posts

Posted by Karlos > 2024-02-02 08:36 | Report Abuse

A lot of projects going will take off in Johor some of them will involved dredging and reclamation works so no wonder the boss buying back the shares!

Posted by Everybody8888888 > 2024-02-02 11:22 | Report Abuse

It seems like good news may out soon

BILLC

2,047 posts

Posted by BILLC > 2024-02-02 11:57 | Report Abuse

This cap ayam boss after so long baru buy back his cap ayam stock,,,,,,,hahahaha,,,,

koyokui

1,964 posts

Posted by koyokui > 2024-02-16 17:06 | Report Abuse

Benalec tp 15sen

Michael Kwok

6,445 posts

Posted by Michael Kwok > 2024-02-19 13:27 |

Post removed.Why?

Posted by wilsonchan87 > 2024-02-26 12:41 | Report Abuse

hopeless this counter. PN17 soon

willpush

33 posts

Posted by willpush > 2024-02-28 17:54 | Report Abuse

Quarterly rpt on consolidated results for the financial period ended 31 Dec 2023
BENALEC HOLDINGS BERHAD

https://www.klsescreener.com/v2/announcements/view/6599857

Posted by wilsonchan87 > 2024-02-28 18:52 | Report Abuse

huge loss

King7

459 posts

Posted by King7 > 2024-03-14 10:38 | Report Abuse

Buatlah solar farm better than let the land empty. It is a good idea to sell electricity.

koyokui

1,964 posts

Posted by koyokui > 2024-03-20 09:43 | Report Abuse

Buy benalec also johor theme

Posted by bulltrading > 2024-06-04 18:19 | Report Abuse

Yes benalec got so many flat lands, can use and invest in solar farm which will make a lot of money. Now the old palm oil estate also convert it to solar farm investment.

kenwilbur

87 posts

Posted by kenwilbur > 2024-06-11 16:40 | Report Abuse

Huge loss

Michael Kwok

6,445 posts

Posted by Michael Kwok > 2024-07-04 19:53 | Report Abuse

Benalec 15.5 cents
Second phase upward.the first phase cancel by someone.duhhh.
Tp 25 cents above.many will 3-5 cents down,then big momentum come in.the benalec land,hear from my friend increase by 50 percents.due ti many land increase by 50-100 percent in johor,due to data center,AI,the agong from johor want rm 100 billion developement in johor.lrt,highway,financial center and others
4/7/24 7.55pm

MrXYZ

146 posts

Posted by MrXYZ > 2024-07-15 20:18 | Report Abuse

Come on Benalec! GO GO GO!

Tigerchan

362 posts

Posted by Tigerchan > 2024-07-18 12:36 | Report Abuse

Wait for 0.13-0.135, best buy dont dream. 0.15 too high price, many land so what, leave to idle. Sell land no use, develop it then you see the reward. Look at Ecovest, buy land from IWCITY, left to right hand profit, then develop. Same boss.

MrXYZ

146 posts

Posted by MrXYZ > 2024-08-20 19:35 | Report Abuse

Stock yang macam mau mampos...

Karlos

1,284 posts

Posted by Karlos > 1 month ago | Report Abuse

Yesterday 400 K was traded off market at 15 sen.

Post a Comment
Market Buzz